Battery to do discharge test, 24VDC 200AH, what recommended virtual load can I use?

Encyclopedia
Field: Encyclopedia
0
China

Programmable DC electronic load:

Advantages: This type of virtual load can accurately set discharge current, voltage and other parameters according to your test needs, with high accuracy and stability. It can simulate a variety of different load conditions, such as constant current, constant voltage, constant power and other modes, so that you can carry out battery discharge tests under different conditions. And it can monitor and record the voltage, current, power and other data of the battery during the discharge process in real time, which is very helpful for analyzing the performance and status of the battery. For example, you can set it to start with a smaller current and gradually increase it to see how the battery performs under different loads.

Disadvantages: The price is relatively high, and requires a certain amount of professional knowledge and operating skills to use and set up properly.

Resistance box:

Advantages: Resistance boxes are a relatively simple and cost-effective option for virtual loads. By selecting different resistance values, the discharge current can be controlled. The principle is simple and easy to understand, the operation is relatively simple, and it is suitable for some occasions where the test accuracy is not particularly high. For example, in some small battery repair shops or laboratories, resistance boxes are a common battery discharge test tool.

Disadvantages: The discharge current of the resistance box is not stable enough and may be affected by factors such as ambient temperature. Moreover, it is impossible to set and control various discharge parameters as accurately as programmable DC electronic loads, and it is impossible to record detailed test data in real time.

Dedicated battery discharge load equipment:

Advantages: These devices are specifically designed for battery discharge testing and have good compatibility and reliability. It usually has a variety of protection functions, such as overcurrent protection, overheat protection, short circuit protection, etc., which can effectively protect the safety of the battery and test equipment. And the operation interface is simple and intuitive, easy to use, suitable for different levels of users.

Disadvantages: Dedicated battery discharge load equipment is generally large and not easy to carry. And its function may be relatively simple, can only be used for battery discharge test, can not have a variety of functions and application scenarios like programmable DC electronic load.

When choosing a virtual load, you need to consider factors such as your specific test needs, budget, and requirements for test accuracy. If accurate testing and data analysis are required, programmable DC electronic loads are a better choice. If the budget is limited or the test accuracy requirements are not high, resistance boxes or dedicated battery discharge load equipment can also meet the basic test needs.

Give a tip and encourage the author!
Topics:

Recommended

Why Must a Transformer Core Be Grounded at Only One Point? Isn't Multi-Point Grounding More Reliable?
Why Does the Transformer Core Need to Be Grounded?During operation, the transformer core, along with the metal structures, parts, and components that fix the core and windings, are all situated in a strong electric field. Under the influence of this electric field, they acquire a relatively high potential with respect to ground. If the core is not grounded, a potential difference will exist between the core and the grounded clamping structures and tank, which may lead to intermittent discharge.I
01/29/2026
Understanding Transformer Neutral Grounding
I. What is a Neutral Point?In transformers and generators, the neutral point is a specific point in the winding where the absolute voltage between this point and each external terminal is equal. In the diagram below, pointOrepresents the neutral point.II. Why Does the Neutral Point Need Grounding?The electrical connection method between the neutral point and earth in a three-phase AC power system is called theneutral grounding method. This grounding method directly affects:The safety, reliabilit
01/29/2026
Voltage Imbalance: Ground Fault, Open Line, or Resonance?
Single-phase grounding, line break (open-phase), and resonance can all cause three-phase voltage unbalance. Correctly distinguishing among them is essential for rapid troubleshooting.Single-Phase GroundingAlthough single-phase grounding causes three-phase voltage unbalance, the line-to-line voltage magnitude remains unchanged. It can be classified into two types: metallic grounding and non-metallic grounding. Inmetallic grounding, the faulted phase voltage drops to zero, while the other two phas
11/08/2025
Composition and Working Principle of Photovoltaic Power Generation Systems
Composition and Working Principle of Photovoltaic (PV) Power Generation SystemsA photovoltaic (PV) power generation system is primarily composed of PV modules, a controller, an inverter, batteries, and other accessories (batteries are not required for grid-connected systems). Based on whether it relies on the public power grid, PV systems are divided into off-grid and grid-connected types. Off-grid systems operate independently without relying on the utility grid. They are equipped with energy-s
10/09/2025
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.