Secondary circuit diagram of voltage transformer using V/V-▲ connection

Master Electrician
10/18/2024

Secondary circuit diagram of voltage transformer using V/V-▲ connection

屏幕截图 2024-10-18 084300.jpg

Master Electrician

We aim to gather electrical knowledge and share it with others.

The grounding resistance of the box transformer is usually required to be ≤ 4Ω. Do you know why?
The grounding resistance of the box transformer is usually required to be ≤ 4Ω. Do you know why?
As a key power distribution equipment, the safe operation of a compact substation relies on reliable grounding measures. People often wonder: Why is the grounding resistance of a compact substation generally required to be no more than 4Ω? Behind this value, there are rigorous technical bases and application scenario restrictions. In fact, the requirement of ≤4Ω is not mandatory in all cases. It mainly applies to scenarios where the high - voltage system adopts "ungrounded", "reso
Edwiin
07/23/2025
Application of Prefabricated Substation Enclosures in Utility-Scale PV Plants at High Altitudes
Application of Prefabricated Substation Enclosures in Utility-Scale PV Plants at High Altitudes
In recent years, driven by policies and the enabling environment, the domestic new energy industry has achieved rapid development. A large number of photovoltaic (PV) projects have been introduced into the power market, and high-altitude PV projects are among them. If prefabricated cabin substations can be utilized scientifically and rationally, high-altitude PV projects can feature short construction cycles, quick commissioning, and relatively low investment levels. This is of great significanc
Echo
06/14/2025
Research and Application of Prefabricated Enclosure Structure for High-Voltage Compartments in Substations
Research and Application of Prefabricated Enclosure Structure for High-Voltage Compartments in Substations
The economic development demands higher efficiency in substation construction, giving rise to prefabricated cabin substation technology. With modular design, equipment wiring, commissioning, and prefabrication are completed in factories, requiring only "building-block" assembly on-site. Take the 10kV prefabricated high-voltage room as an example: equipment and cabin are installed in the factory, with on-site work limited to busbar and cabin assembly. The main transformer incoming line connects v
Echo
06/14/2025
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
Modular Intelligent Substation - Prefabricated Secondary Switchgear Integration Assembly
With the development of the national economy and society, the requirements for the quality and craftsmanship of power grid projects have become increasingly stringent. The need to improve the construction progress and quality of substations has created opportunities for the promotion of prefabricated cabin - type intelligent substations. The traditional on - site wiring and commissioning of secondary substation equipment involve a large amount of work. Moreover, on - site construction has to wai
Echo
06/13/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!