What to Pay Attention to When Selecting and Installing GIS Current Transformers?

James
07/07/2025

Hi everyone, I'm James, and I've been working with current transformers (CTs) for 10 years. Today, I’ll talk about what you need to watch out for when selecting and installing GIS current transformers.

Part 1: Key Considerations During Selection
1. Accuracy Class

  • Protection-grade CTs: Used for relay protection — focus on overload capacity and transient response.
  • Metering-grade CTs: Used for billing purposes — require high accuracy, usually 0.2S or 0.5S class.

2. Rated Primary Current

Choose based on the system’s maximum load current, and leave some margin to avoid overheating due to long-term full-load operation.

3. Insulation Level

Make sure the CT meets the insulation requirements of your voltage level, especially for withstand voltage tests.

4. Environmental Adaptability

Pick models that can handle the environmental conditions like extreme temperatures, humidity, or corrosion — look for anti-corrosion materials or special coatings.

5. Space Limitations

GIS equipment is compact, so make sure the CT size fits well without interfering with other components.

Part 2: Important Installation Notes
1. Follow Manufacturer Instructions

Always install according to the manual. Skipping steps might seem harmless now, but it can lead to big problems later.

2. Grounding

The secondary side must be reliably grounded to prevent dangerous induced voltages. Don’t forget to check primary-side grounding either.

3. Sealing Check

Since GIS uses SF6 gas, proper sealing is critical. Carefully inspect all flanges and joints before installation — even a small leak can cause serious issues.

4. Insulation Test After Installation

Do an insulation resistance test after installation to ensure everything is up to standard — especially important in humid environments.

5. Commissioning & Calibration

After installation:

  • Confirm polarity;
  • Test the ratio;
  • Check secondary circuit connections;
  • Run a simulated load test to verify performance.

6. Dust & Contamination Protection

During installation, cover open parts with protective covers to prevent dust or debris from getting inside.

Part 3: Final Thoughts

As someone who's worked in this field for over a decade, here's my takeaway:

“Selecting and installing GIS current transformers isn't just about picking and placing — it requires careful planning and attention to detail.”

If you run into challenges during selection or installation, feel free to reach out. I’m happy to share more hands-on experience and practical solutions.

Here’s hoping every GIS current transformer runs smoothly and safely!

— James

James

Professionalism builds strength. As an expert in the installation and operation of electrical equipment, I am proficient in the installation process and strictly adhere to standards. I skillfully master the operation essentials and can swiftly eliminate faults. With a heart that constantly explores new knowledge, I illuminate the path to the efficient operation of electrical equipment.

Selection and Application of Small Reactors at the Neutral Point of 500kV Substations
Selection and Application of Small Reactors at the Neutral Point of 500kV Substations
1 Relevant Theories of Small Neutral Point Reactors in 500kV Substations1.1 Definitions and RolesA reactor is a key power system component that controls the phase relationship between AC current and voltage, divided into inductive and capacitive types. Inductive reactors limit short-circuit currents and improve stability; capacitive ones enhance transmission efficiency and voltage quality. A small neutral point reactor is a specialized type connected between a three-phase system's neutral point
Echo
07/25/2025
What are the comprehensive considerations for product selection and installation?
What are the comprehensive considerations for product selection and installation?
In real-world engineering projects, selecting and installing 35kV combined instrument transformers isn't just a matter of "buying and installing" — it requires a comprehensive evaluation of many factors, such as environmental conditions, equipment performance, and maintenance convenience. Only by taking all these aspects into account can we ensure that the equipment runs safely and stably for a long time under specific conditions.1. Oil-Immersed vs. Dry-Type Transformers — Which One
James
07/22/2025
What aspects should be considered when selecting and installing 35kV combined transformers?
What aspects should be considered when selecting and installing 35kV combined transformers?
The installation quality of combined instrument transformers directly affects whether they can operate safely and stably. Therefore, during the installation process, several key aspects must not be overlooked — such as foundation construction, grounding, sealing checks, testing and commissioning, as well as secondary wiring. Below, I’ll explain these points in a more conversational way.1. Foundation Construction Must Be Solid, Especially in Plateau AreasAlthough a combined instrument
James
07/22/2025
A Quick Verification Method for Low-Voltage Current Transformers
A Quick Verification Method for Low-Voltage Current Transformers
1. Selection of Low - Voltage Current Transformer ConfigurationThere are many factors leading to wrong selection of low - voltage current transformers in civil construction projects. For example, common factors include design problems: the calculated coefficient designed for the load of electrical equipment is relatively large, or the transformation ratio of the current transformer is selected incorrectly. Such a series of reasons will affect the use of electrical equipment. Therefore, in the co
James
07/16/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!