The 10kV outdoor circuit breaker burned out and the energy storage motor malfunctioned

Felix Spark
Felix Spark
Field: Failure and maintenance
China

Fault Description

In a certain place, the ZWG - 12 type outdoor vacuum circuit breaker is used for the 10kV circuit breaker. On September 29, 2015, when the circuit breaker in the 172 Zhakou Line interval was to be closed remotely, it was found that the remote closing operation failed. When the operating personnel arrived at the site and inspected, they found scattered iron filings on the ground directly beneath the circuit breaker. After manually energizing the circuit breaker, they operated it and found that the manual opening and closing functions were intact, but the circuit breaker could not complete the electric energy - storage operation. The equipment operation and maintenance personnel promptly reported the defect to the maintenance department. After the maintenance personnel opened the cover plate of the circuit breaker, they found a small pile of iron filings accumulated at the bottom of the circuit breaker mechanism box, and the energy - storage gear of the switch mechanism was severely worn.

 

Cause Analysis

Based on the fault phenomenon that the motor couldn't perform electric energy storage, the maintenance personnel initially suspected a fault in the motor power supply. However, through measurement, this assumption was ruled out. Considering the worn - out energy - storage mechanism at the scene, the maintenance personnel determined that the energy - storage motor had burned out. The measured resistance of the motor winding circuit at the scene was 247 MΩ, confirming the motor burnout.

Regarding the reasons for the motor burnout, generally, there are two possible situations: mechanical faults and electrical faults. A mechanical fault mainly refers to the jamming of the circuit breaker's energy - storage mechanism. This causes the motor to stall during the energy - storage process, leading to motor burnout. In the power system, some circuit breakers are rarely subjected to power - outage operations due to high - level loads. As a result, the mechanisms remain stationary for a long time. Rust and dust accumulation can cause severe jamming of the mechanism. When it reaches a certain degree, the output torque of the energy - storage motor cannot overcome the mechanism's resistance, resulting in motor burnout.

An electrical fault mainly occurs in the motor circuit. When the energy storage is completed, the micro - switch connected in series in the energy - storage circuit fails to disconnect in time. The motor keeps running, but due to the obstruction of the energy - storage holding pawl, the motor stalls and burns out due to overheating.

Fault Handling

The maintenance personnel first removed the motor from the standby interval circuit breaker and replaced the burned - out motor. Subsequently, they manually energized the spring. After the energy - storage process, they measured the micro - switch, and the measurement showed that the micro - switch contacts were in the open state, indicating normal function. When performing the opening and closing operations, they found that there was no jamming in the circuit breaker's energy - storage mechanism.

The maintenance personnel then closed the circuit breaker and carried out electric energy storage. During the energy - storage process, they found that the spring completed energy storage, but the motor kept running. To prevent the motor from burning out again, the maintenance personnel immediately opened the circuit breaker. With the spring energized, they repeatedly tested the on - off state of the micro - switch. The test results showed that regardless of the state of the micro - switch, the motor circuit remained connected. Further inspection of the circuit ruled out the possibility of a parasitic circuit.

When performing electric energy storage again, the maintenance personnel gently pressed the micro - switch with a screwdriver, and the motor stopped running. Based on this, they determined that the micro - switch was damaged. The maintenance personnel replaced it with a new original - factory micro - switch. When the motor was used for energy storage for the first time after the replacement, the motor kept running again when the spring completed energy storage. The maintenance personnel loosened the two fixing screws of the micro - switch, moved the limit switch as close as possible to the gear that presses it, and then fixed it. After that, the electric energy - storage operation returned to normal.

Combining the handling process, the maintenance personnel reached the following fault conclusion: When the spring completed energy storage, due to the small installation margin of the micro - switch itself and the severe wear of the micro - switch compression head, the stroke of the energy - storage mechanism compressing the micro - switch was reduced. The micro - switch was in a critical "virtual open" state. When the circuit breaker was closed, the 220 V AC current broke down the air between the virtual open points of the contacts, connecting the energy - storage circuit, and the motor kept running. When using the resistance gear of a multimeter to measure after opening the circuit breaker, the battery voltage of the multimeter was relatively low and not enough to break down the gap. Therefore, the measurement showed that the micro - switch was in the open state.

 Countermeasures and Suggestions

For this type of fault, it is recommended to strengthen the inspection of this type of outdoor circuit breaker and replace the severely worn micro - switches as soon as possible to avoid motor - burnout accidents. Currently, the design of outdoor circuit breakers lacks a mechanism to connect the energy - storage timeout signal, and there is a lack of monitoring for abnormal energy - storage situations. It is suggested that when conditions permit, the energy - storage timeout signal should be connected to the background alarm system.

Give a tip and encourage the author!
Recommended
How to Test Vacuum in Vacuum Circuit Breakers
How to Test Vacuum in Vacuum Circuit Breakers
Vacuum Integrity Testing of Circuit Breakers: A Critical Measure for Performance EvaluationVacuum integrity testing is a key method for assessing the vacuum performance of circuit breakers. This test effectively evaluates the insulation and arc-quenching capabilities of the breaker.Before testing, ensure the circuit breaker is properly installed and correctly connected. Common vacuum measurement methods include the high-frequency method and the magnetic control discharge method. The high-frequen
Oliver Watts
10/16/2025
Ensure Hybrid System Reliability with Full Production Testing
Ensure Hybrid System Reliability with Full Production Testing
Production Testing Procedures and Methods for Wind-Solar Hybrid SystemsTo ensure the reliability and quality of wind-solar hybrid systems, several critical tests must be conducted during production. Wind turbine testing primarily includes output characteristic testing, electrical safety testing, and environmental adaptability testing. Output characteristic testing requires measuring voltage, current, and power under varying wind speeds, plotting wind-power curves, and calculating power generatio
Oliver Watts
10/15/2025
Electrical Meter Accuracy Issues? Solutions Revealed
Electrical Meter Accuracy Issues? Solutions Revealed
Analysis of Measurement Errors in Electrical Instruments and Elimination Strategies1.Electrical Instruments and Common Testing MethodsElectrical instruments play a vital role in the generation, transmission, and utilization of electricity. As a special form of energy, electricity requires strict safety standards in production and use. Safe electricity usage is crucial to daily life, production, and socio-economic development. Power system monitoring relies on electrical instruments, which are of
Oliver Watts
10/07/2025
High-Voltage Electrical Testing: Key Safety Requirements for Field Operations
High-Voltage Electrical Testing: Key Safety Requirements for Field Operations
The test site layout must be reasonable and organized. High-voltage testing equipment should be placed close to the test object, live parts must be isolated from each other, and remain within the clear line of sight of test personnel. Operational procedures must be rigorous and systematic. Unless otherwise specified, voltage must not be suddenly applied or removed during operation. In case of abnormal conditions, voltage increase must be stopped immediately, pressure rapidly reduced, power disc