Safety Precautions for Electrical System

Electrical4u
Field: Basic Electrical
0
China

Electrical Safety Precautions

Actual safety requires whole hearted cooperation, from all levels of workers involved in the work. It is need not to say, that all the people engaged in the electrical work should well aware of all safety rules and regulations related to the work they are executing. The workers executing the work should be extremely disciplined. Electrical work should not be done by wearing loose dresses.

Before starting the work, the working place should be made neat and clean. The place should also be sufficiently illuminated before work. All levels of voltage should be considered equally dangerous. Even the voltage levels which cannot produce electrical shock should also not be ignored. We shall first confirm the circuit is dead before touching it for repairing maintenance and any others works.


    • We have to switch off, isolate and properly earth the circuit before doing any work with the circuit.

    • We shall only execute the work after getting properly issued work permit from the concerned operating personal.

    • The work permit can only be issued after making the circuit completely dead, isolated and earthed.

    • We must display Danger Board at the place of work.

    • We should not allow any unauthorized person to enter in the working place.

    • We should not put any new equipment into the service without necessary testing by authority.

    • All electrical equipments, bays, circuits, should be identified by properly viewable labels to avoid any mistake.

personal protective equipments

  • We should not work on electrical circuit during heavy lightning storm.

  • We should wear shoes having sewn soles, preferably insulated rubber soles.

  • We should not wear suspenders, arm bands, with metal buckets or other metal parts. We also do not wear metal key chain or metal keepers for key rings or watch rings outside the clothing during work. We should always, take extra precaution while work in extra damp area.

  • When there is a hurry to do the work, the tired and exhausted workers should be avoided to do so.

  • We should not toss the tools or working materials to other person. It is better to deliver the tools and materials hand to hand.

  • We should not keep any tools at the edge of equipment cabinet or structure from where these may fall off.

  • We should not do anything which may startle the person working in hazardous condition.

Statement: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Give a tip and encourage the author!

Recommended

Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
01/30/2026
Neutral point grounding operation mode for 110kV~220kV power grid transformers
The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
01/29/2026
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
01/29/2026
HECI GCB for Generators – Fast SF6 Circuit Breaker
1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
01/06/2026
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.