Dew point online monitoring for SF6 gas Insulated equipments

Edwiin
Field: Power switch
China

Traditionally, the moisture level in SF6 gas - insulated equipments was checked by periodically collecting gas samples. However, in recent years, condition monitoring systems equipped with online instrumentation for measuring the dew point of SF6 have become increasingly prevalent.

Nowadays, it is quite common to install dew point sensors in the same sensor block as pressure relays or density sensors. Additionally, these sensor blocks are often not directly attached to the main gas tank. Instead, they are connected to the tank using either polymeric or metal tubing.

To ensure the most accurate online dew point measurement in an SF6 - insulated system, the sensor should be installed as close as possible to the main gas volume. Ideally, it should be directly mounted onto the tank wall. Minimizing the number of connection points and avoiding the use of plastic or rubber materials in the vicinity of the measurement cell are also highly advantageous.

The quality and long - term stability of the sensor being used are also crucial factors.

In the picture, we can see the installation of a dew point - pressure - temperature sensor for ABB GIS equipment. This sensor is directly connected to the main gas tank.

Give a tip and encourage the author!

Recommended

Main Transformer Accidents and Light Gas Operation Issues
1. Accident Record (March 19, 2019)At 16:13 on March 19, 2019, the monitoring background reported a light gas action of No. 3 main transformer. In accordance with the Code for Operation of Power Transformers (DL/T572-2010), operation and maintenance (O&M) personnel inspected the on-site condition of No. 3 main transformer.On-site confirmation: The WBH non-electrical protection panel of No. 3 main transformer reported a Phase B light gas action of the transformer body, and the reset was ineff
02/05/2026
Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
01/30/2026
Neutral point grounding operation mode for 110kV~220kV power grid transformers
The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
01/29/2026
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
01/29/2026
Related Products
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.