• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


semiconductor fuses DNT-O1N Series semiconductor protection fuse

  • semiconductor fuses DNT-O1N Series semiconductor protection fuse
  • semiconductor fuses DNT-O1N Series semiconductor protection fuse
  • semiconductor fuses DNT-O1N Series semiconductor protection fuse

Key attributes

Brand Switchgear parts
Model NO. semiconductor fuses DNT-O1N Series semiconductor protection fuse
Rated voltage AC 1000V
Rated normal current 630-1500A
Breaking capacity 100kA
Series DNT-01N

Product descriptions from the supplier

Description

The DNT □ – O1N series semiconductor equipment protection fuse is suitable for AC systems, with a rated voltage of 1000V and a rated current of 160A~1500A. It is used for short-circuit protection of semiconductor components and their complete equipment. All performance indicators of the product comply with GB/T 13539.4/IEC 60269-4.

Basic parameters of fuse links

Product model size Rated voltage          V Rated current         A Rated breaking  capacity    kA
DNT1-O1N-160 1 AC 1000 160 100
DNT1-O1N-200 200
DNT1-O1N-250 250
DNT1-O1N-315 315
DNT1-O1N-350 350
DNT1-O1N-400 400
DNT1-O1N-450 450
DNT1-O1N-500 500
DNT1-O1N-550 550
DNT1-O1N-630 630
DNT2-O1N-350 2 350
DNT2-O1N-400 400
DNT2-O1N-450 450
DNT2-O1N-500 500
DNT2-O1N-550 550
DNT2-O1N-630 630
DNT2-O1N-710 710
DNT2-O1N-800 800
DNT3-O1N-630 3 630
DNT3-O1N-710 710
DNT3-O1N-800 800
DNT3-O1N-900 900
DNT3-O1N-1000 1000
DNT3-O1N-1100 1100
DNT3-O1N-1250 1250
DNT3-O1N-1400 1400
DNT3-O1N-1500 1500
Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 1000m² Total staff: Highest Annual Export(usD): 300000000
Workplace: 1000m²
Total staff:
Highest Annual Export(usD): 300000000
Services
Business Type: Sales
Main Categories: Low Voltage Electrical Apparatus/Instrument meters/Production equipment/Tester/High Voltage Electrical Apparatus/Electrical fittings/Equipment Parts
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Main Transformer Accidents and Light Gas Operation Issues
    1. Accident Record (March 19, 2019)At 16:13 on March 19, 2019, the monitoring background reported a light gas action of No. 3 main transformer. In accordance with the Code for Operation of Power Transformers (DL/T572-2010), operation and maintenance (O&M) personnel inspected the on-site condition of No. 3 main transformer.On-site confirmation: The WBH non-electrical protection panel of No. 3 main transformer reported a Phase B light gas action of the transformer body, and the reset was ineff
    02/05/2026
  • Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
    Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
    01/30/2026
  • Neutral point grounding operation mode for 110kV~220kV power grid transformers
    The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
    01/29/2026
  • Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
    Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
    01/29/2026
  • Why Must a Transformer Core Be Grounded at Only One Point? Isn't Multi-Point Grounding More Reliable?
    Why Does the Transformer Core Need to Be Grounded?During operation, the transformer core, along with the metal structures, parts, and components that fix the core and windings, are all situated in a strong electric field. Under the influence of this electric field, they acquire a relatively high potential with respect to ground. If the core is not grounded, a potential difference will exist between the core and the grounded clamping structures and tank, which may lead to intermittent discharge.I
    01/29/2026
  • Understanding Transformer Neutral Grounding
    I. What is a Neutral Point?In transformers and generators, the neutral point is a specific point in the winding where the absolute voltage between this point and each external terminal is equal. In the diagram below, pointOrepresents the neutral point.II. Why Does the Neutral Point Need Grounding?The electrical connection method between the neutral point and earth in a three-phase AC power system is called theneutral grounding method. This grounding method directly affects:The safety, reliabilit
    01/29/2026
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.