Southeast Asia Power Grid Solutions: Resilient Electronic Voltage Transformers for Extreme Environments

07/24/2025

  1. Southeast Asia Market Pain Points & EVT Solutions

​Pain Points

​EVT Solutions

High Temperature & Humidity

IP67 Protection + Silicone Potting:​ Withstands 40°C/95% RH environments, increasing lifespan by 50%.

Frequent Grid Fluctuations

Class 0.2 Accuracy + Wide Input Range (110kV-500kV):​ Adapts to unstable grids.

Difficult Island Deployment

Modular Design (<20kg/unit):​ Enables helicopter airlifting, reducing remote area installation costs.

Combustible Traditional Transformers

Dry-Type Solid-State Design:​ Eliminates fire risk (Certified to IEC 61869-11).

Smart Grid Integration Needs

Digital Output (IEC 61850-9-2LE):​ Seamless integration with SCADA/EMS.

II. Core Technology Highlights

  1. Adaptive Compensation Technology
    • Real-time temperature drift compensation (<0.05% accuracy deviation from -40°C to +85°C)
    • Anti-harmonic interference algorithm (≤0.5% measurement error at THD >30%)
  2. Hybrid Sensing Structure
  3. Localized Power Solutions
    • Solar Harvesting Module (Optional): Powers off-grid deployments.
    • Supercapacitor Backup: Ensures 30-minute operation during grid outages.

III. Southeast Asia Customized Services

  1. Standards Compliance Solutions

Country

Compliance Standard

Tailored Service

Vietnam

QCVN 01:2020/BCT

Localized certification support at Hanoi Metrology Institute

Thailand

EGAT SPS-T-503

Pre-stocked inventory in Bangkok Bonded Warehouse (72h delivery)

Indonesia

PLN DIN 04385

Jakarta Technical Center + Javanese Manuals

Philippines

PEC 2017 Section 110

Typhoon-resistant mounting brackets (80m/s wind speed)

  1. Cost-Effective Solutions
    Leasing Model:
    • Deposit: $500/unit
    • Monthly Fee: $500/unit (Includes remote diagnostics)
    • Buyout Option after 3 years (30% residual value)

IV. Success Case

Thailand Provincial Electricity Authority Project (200 EVT Units Deployed):

  • 62% Reduction in Installation Costs:​ (Traditional CTs required 3-day substation shutdown; EVTs installed live in 4 hours).
  • Fault Response Time Reduced from 72 hours to <8 hours:​ Achieved via remote diagnostics + local support.

 