The 8-Phase Guide to Installing LW25-126 High-Voltage Circuit Breakers Correctly
1. Pre-Installation PreparationsBefore commencing installation work, the following preparatory steps must be completed: Organization and Training: Organize training sessions for all construction personnel on relevant regulations,technical standards, and construction procedures. Special emphasis should be placed on safety protocols. Site Survey: Examine the intended location of the circuit breaker, its foundation, and the layout of surrounding equipment and wiring to prevent accidental contact wi