What Are the Steps for Error Testing GIS Voltage Transformers?

Oliver Watts
07/08/2025

Hey everyone, I'm Oliver, and I've been working with current transformers (CTs) and voltage transformers (VTs) for 8 years.

From assisting my mentor on site to leading high-voltage testing teams and conducting error calibrations independently, I’ve dealt with all kinds of instrument transformers — especially those used in GIS systems. The error test for voltage transformers is something I perform regularly.

A few days ago, a friend asked me:

“Oliver, how exactly do you perform an error test on a GIS voltage transformer? What’s the process?”

That’s a super practical question! So today, I want to share with you:

What are the actual steps involved in testing the error of a GIS voltage transformer — and what should you watch out for?

No complicated jargon — just plain, real-world talk based on my hands-on experience over the past eight years. Let’s get into it!

1. What Is a VT Error Test?

Simply put, an error test checks whether the output voltage of the VT matches the actual input voltage — in other words, how accurate the transformer really is.

If the error is too large:

  • The metering data will be off, which affects billing.
  • Protection devices might misinterpret signals and either trip unnecessarily or fail to operate when needed.

So this isn’t just a formality — it’s a critical check.

2. Preparation Before the Test
2.1 Clarify the Purpose

Are you testing for factory acceptance, commissioning, or routine maintenance? Each case may have slightly different requirements.

2.2 Check Connections and Safety

  • Ensure the primary side of the VT is de-energized and properly grounded.
  • Confirm secondary wiring is correct.
  • Make sure your test equipment — like the voltage booster, standard VT, and error tester — is in good condition and within calibration period.

2.3 Prepare Reference Equipment

You’ll usually need a high-accuracy reference voltage transformer to compare against the one being tested.

2.4 Step-by-Step Testing Procedure
Step 1: Set Up the Test Circuit

  • Connect the primary side to the voltage source.
  • Connect both the test VT and the standard VT in parallel.
  • Connect the secondary outputs to the error tester.

Important: Make sure the polarity is correct — otherwise, errors will be exaggerated or the test will fail outright.

Step 2: Slowly Raise the Voltage to Rated Level

  • Increase voltage gradually and evenly.
  • Watch for any unusual sounds or signs of discharge.
  • Once rated voltage is reached, let it stabilize for a moment.

Step 3: Record the Error Data

At rated voltage, read and record:

  • Ratio error
  • Phase angle error

Also test under different load conditions — such as 25%, 50%, and 100% of rated burden.

Step 4: Analyze the Results

  • Compare the measured values with national standards or nameplate specifications.
  • If the error exceeds acceptable limits, the VT may need further inspection or repair.

3. Common Issues & How to Handle Them

4. Final Thoughts

As someone who's worked in this field for 8 years, here's what I’ve learned:

“The VT error test may seem detailed, but as long as the procedure is followed carefully and the setup is solid, it’s totally manageable.”

If you're new, try doing it with an experienced colleague at least once. And if you're seasoned, don’t get complacent — safety and accuracy always come first.If you ever run into issues during testing or feel unsure about certain steps, feel free to reach out. I’m happy to share more hands-on experience and tips.Here’s hoping every GIS voltage transformer runs safely and accurately!

— Oliver

Oliver Watts

Hey! I'm Oliver Watts, an electrical engineer in Inspection and Testing. With years of hands - on experience, I ensure electrical systems meet top safety and performance standards. Using advanced gear, I conduct diverse tests, easily spotting issues in both large - scale industrial and small - scale commercial setups. I love teaming up, sharing knowledge, and keeping up with industry regs. Also, I'm skilled at data analysis with software. If you're into electrical inspection or just want to chat engineering, reach out. Let's connect and explore!

Research on the Withstand Voltage Test Method for UHV Oil - immersed Reactors
Research on the Withstand Voltage Test Method for UHV Oil - immersed Reactors
1 Investigation of Insulation Defects in UHV Oil - immersed ReactorsKey challenges in high - voltage oil - filled reactors during operation include insulation faults, iron - core magnetic leakage heating, vibration/noise, and oil leakage.1.1 Insulation FaultsParallel - connected reactors, once connected to the main grid’s primary coil and put into use, operate at full power long - term. Sustained high voltage raises operating temperatures, accelerating aging of coil insulation materials an
Oliver Watts
07/24/2025
Research on the Evaluation Method of Uncertainty in the Verification and Measurement Results of Electronic Voltage Transformers in Power Grids
Research on the Evaluation Method of Uncertainty in the Verification and Measurement Results of Electronic Voltage Transformers in Power Grids
1. IntroductionGrid electronic voltage transformers, as indispensable measuring components in power systems, have their measurement accuracy directly tied to the stable operation and efficient management of power systems. However, in practice, due to the inherent characteristics of electronic components, environmental factors, and limitations of measurement methods, the measurement results of voltage transformers often involve uncertainty. This uncertainty not only impacts the accuracy of power
Oliver Watts
07/24/2025
Test of 10 kV Electronic Current Transformer
Test of 10 kV Electronic Current Transformer
1 Performance AdvantagesIn recent years, electronic current transformers (ECTs) have emerged as a key industry trend. National standards classify them into two types: Active Optical Current Transformers (AOCTs, active hybrid type) and Optical Current Transformers (OCTs, passive optical type). Active hybrid ECTs use low-power electromagnetic transformers and Rogowski coils as core sensing elements (Figure 1).Rogowski coils outperform traditional sensors with non-saturation and wide dynamic ranges
Oliver Watts
07/22/2025
What Tests Are Required for a Qualified Combined Instrument Transformer?
What Tests Are Required for a Qualified Combined Instrument Transformer?
Hi everyone, I’m Oliver, and I’ve been working in the instrument transformer industry for almost eight years now. From a complete newbie to someone who can now handle things independently, I’ve participated in dozens of combined instrument transformer inspections over the years.Today, I’d like to share with you: What tests must a qualified combined instrument transformer go through before leaving the factory or being put into operation? After all, it's a very critical pie
Oliver Watts
07/21/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!