Basic Structure and Working Principle of Induction Motor


The induction motor is mainly composed of two parts: stator and rotor. The stator part includes the stator core and stator winding, etc. The stator core is a part of the motor magnetic circuit, and the stator winding is connected to AC power to generate a rotating magnetic field.


The rotor part has types such as squirrel-cage rotor and wound-rotor, taking the squirrel-cage rotor as an example, it is embedded with copper bars or aluminum bars in the rotor core slot and connected at both ends by a short-circuiting ring.


Its working principle is based on the law of electromagnetic induction. When three-phase alternating current is applied to the stator winding, a rotating magnetic field is generated in the stator space. This rotating magnetic field cuts across the rotor conductor, and according to the principle of electromagnetic induction, an induced electromotive force is generated in the rotor conductor.


Since the rotor winding is closed, an induced current will be produced. And this induced current will be subjected to the action of electromagnetic force in the rotating magnetic field, which will make the rotor rotate with the rotating magnetic field.


Does the induction motor need to be oiled?


The bearings in an induction motor require lubrication. This is because the bearings experience friction during the operation of the motor, and proper lubrication can reduce frictional losses, decrease wear, extend the service life of the bearings, and thereby ensure the normal operation of the motor. However, other parts of the motor, such as the stator windings and rotor core, do not need to be lubricated.


Parts to be Oiled and Oil Change Schedule


Lubrication Points


Mainly the bearing part of the motor needs to be greased.


Lubrication Cycle


For motors with fueling devices


For motors that are read every other month (accumulator), determine whether to add oil as required in the logbook. Each oiling should be combined with state monitoring, such as recording the decibel value before and after oiling (the motor should run for more than five minutes after oiling before measuring the decibel value).


Generally, after 4-6 oilings, it is necessary to contact for shutdown to drain oil and make corresponding records. After maintenance of motors with oiling devices, it should also be noted in the logbook. At the same time, the oiling device should be included in the patrol inspection content, keeping it clean and in good condition, and report any damage or leakage in a timely manner.


Motors without Lubrication Devices (Taking Roller Bearings as an Example)


There is no need for an oil hole to be constantly refueled; just apply lubricating oil within a certain period of time to meet the requirements. Most of them belong to dry oil lubrication. However, if it is a sliding bearing (which relies on the oil film between the inner and outer liners to separate the friction, such as hydrostatic oil film bearings, hydrodynamic oil film bearings, and hydrostatic-hydrodynamic oil film bearings), it belongs to thin oil lubrication and requires constant oil supply, hence the presence of an oil hole for adding new oil.


There is no absolute fixed standard for the specific cycle, which needs to be judged comprehensively based on the motor's operating environment (such as temperature, humidity, dust conditions, etc.), running duration, load size, and other factors. For instance, motors operating in harsh environments with high temperatures, heavy loads, and lots of dust may require more frequent inspection and oiling maintenance.


Encyclopedia

The Electricity Encyclopedia is dedicated to accelerating the dissemination and application of electricity knowledge and adding impetus to the development and innovation of the electricity industry.

Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!