Application of Phase Shifting or Inversion in Single-Phase Equipment

Single-phase equipment changes the rotation direction of the motor through phase rotation or inversion, which is an important means to achieve flexible control of the equipment. The following is a detailed explanation of this process and its specific applications:

1. Basic Principles of Phase Shift

The working principle of a single-phase motor is to use the alternating magnetic field generated by a single-phase AC power supply to induce a rotating magnetic field through the stator coil, which in turn drives the rotor to rotate. Single-phase motors usually have one main winding and one starting winding, and a starting capacitor is often connected in the starting winding to produce a phase shift, thereby starting the motor and making it turn.

2. Methods for Phase Rotation

2.1 Phase Connection of Switched Power Supply
  • Method: In a single-phase power supply, the two phases of alternating current are marked as "L" (live wire) and "N" (neutral wire). By swapping the connections of the two phases, "L" and "N," the rotation direction of the motor can be changed.

  • Operating Steps:

  1. Cut off the power supply to ensure safety.

  2. Find the coil terminals of the motor, usually marked with color.

  3. Swap the connections of "L" and "N" phases.

  4. Reconnect the power and test the rotation direction of the motor.

2.2 Change the Connection Method of the Starting Capacitor
  • Method: In single-phase motors, starting capacitors are used to generate a phase-shifted magnetic field to start the motor and make it rotate. By changing the connection method of the starting capacitor, the rotation direction of the motor can be changed.

  • Operating Steps:

  1. Cut off the power supply to ensure safety.

  2. Find the starting capacitor of the motor.

  3. Change the starting capacitor connection method, usually involving swapping the capacitor's connection with the winding.

  4. Reconnect the power and test the rotation direction of the motor.


Encyclopedia

The Electricity Encyclopedia is dedicated to accelerating the dissemination and application of electricity knowledge and adding impetus to the development and innovation of the electricity industry.

Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!