How do I change the motor orientation in a star triangle connection?

Encyclopedia
09/28/2024

In a Star-Delta or Y-delta connection, changing the direction of the motor can be achieved by changing the phase sequence applied to the motor windings. The direction of the motor depends on the power supply phase sequence, that is, the order in which the three phases of the power supply reach the motor winding. The following are the specific operation steps and principles:


Star connection (Star/Y connection)


Star connection principle: In a star connection, one end of the three windings is connected together to form a common point (called a neutral point), while the other end is connected to the three phases of the power supply. The connection mode of the motor winding determines the influence of the phase sequence of the power supply on the rotation direction of the motor.


A way to change direction


To change the direction of the motor, the connection sequence of any two windings can be switched. For example, if the original connection order was U-V-W (assumed to be clockwise), you can change the connection order to U-W-V or W-U-V (counterclockwise).


Delta connection (Delta/ Delta connection)


Triangular connection principle: In a triangular connection, three windings are connected end to end to form a closed loop, and one end of each winding is connected to one of the power supply. The triangular connection also depends on the power supply phase sequence to determine the direction of rotation of the motor.


A way to change direction


In a triangular connection, the direction of the motor can also be changed by swapping the connection sequence of any two windings. For example, if the original connection order was U-V-W, you can change the connection order to U-W-V or W-U-V.


Specific operation steps


  • Power off: Before performing any operation, ensure that the motor has been powered off and confirm that there is no residual voltage.


  • Mark the wiring: Before changing the wiring, mark the wiring position of the original each winding to prevent confusion.


  • Disconnect: Disconnect the connection between the motor winding and the power supply.


  • Reconnection: Exchange the connection sequence of any two windings. For example, if the original connection was U-V-W, you can change it to U-W-V or W-U-V.


  • Check cable connections: After reconnecting, check that all cables are correct.


  • Test: Re-power the motor and observe whether the rotation direction of the motor meets the expectations. If the direction is not correct, adjust the wiring sequence again.



Matters needing attention


  • Safety first: Before any electrical operation, be sure to ensure safety, including but not limited to power off, power inspection and other steps.


  • Motor model: Different motors may have different wiring methods, so before changing the wiring sequence, you should consult the motor manual or technical data.


  • Control circuit: If the motor is equipped with a frequency converter (VFD) or other controller, then changing the direction of the motor may need to be achieved through the controller Settings, rather than directly changing the wiring sequence of the motor windings.


Sum up


The key to change the motor direction in the star triangle connection is to adjust the phase sequence of the power supply. By exchanging the connection sequence of any two windings, the rotation direction of the motor can be changed. Whether it is a star connection or a triangle connection, the principle is the same. Ensure that safety procedures are followed during operation and that cables are carefully checked to prevent equipment damage or safety accidents caused by incorrect connections.


Encyclopedia

The Electricity Encyclopedia is dedicated to accelerating the dissemination and application of electricity knowledge and adding impetus to the development and innovation of the electricity industry.

Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!