Lightning impulse voltage withstand test for circuit breakers

Edwiin
Edwiin
Field: Power switch
China

Lightning impulse voltage (LIWL) tests and switching impulse voltage tests are carried out to assess the dielectric stress resulting from transient over - voltages induced by lightning strikes and switching operations respectively. An impulse voltage generator produces a steep - front voltage waveform, which is then applied to the test object. A measurement system, consisting of a voltage divider and a digital recorder, is used to measure and analyze the test voltages and their waveforms.

The figures present examples of a lightning impulse withstand voltage test conducted on a 420 kV live - tank circuit breaker. This test aims to evaluate the critical withstand voltage of the equipment under excessive voltage conditions that exceed the standard values.

This test is a mandatory requirement for every circuit breaker produced in the factory.

In addition to the various specified voltage withstand tests for evaluating the dielectric performance of equipment, after conducting other tests, it is necessary to perform conditioning checks as part of the type tests for switching equipment like circuit breakers. These procedures are carried out in accordance with standards such as IEC 62271 - 1 and IEC 62271 - 100.

Give a tip and encourage the author!
Recommended
What are the causes of dielectric withstand failure in vacuum circuit breakers?
What are the causes of dielectric withstand failure in vacuum circuit breakers?
Causes of Dielectric Withstand Failure in Vacuum Circuit Breakers: Surface contamination: The product must be thoroughly cleaned before dielectric withstand testing to remove any dirt or contaminants.Dielectric withstand tests for circuit breakers include both power-frequency withstand voltage and lightning impulse withstand voltage. These tests must be performed separately for phase-to-phase and pole-to-pole (across the vacuum interrupter) configurations.Circuit breakers are recommended to be t
Felix Spark
11/04/2025
What are the causes of failures in low-voltage switchgear circuit breakers themselves?
What are the causes of failures in low-voltage switchgear circuit breakers themselves?
Based on years of field statistics on switchgear accidents, combined with analysis focusing on the circuit breaker itself, the main causes have been identified as: failure of operation mechanism; insulation faults; poor breaking and closing performance; and poor conductivity.1.Failure of Operation MechanismFailure of operation mechanism manifests as delayed operation or unintended operation. Since the most basic and important function of a high-voltage circuit breaker is to operate correctly and
Felix Spark
11/04/2025
THD Measurement Error Standards for Power Systems
THD Measurement Error Standards for Power Systems
Error Tolerance of Total Harmonic Distortion (THD): A Comprehensive Analysis Based on Application Scenarios, Equipment Accuracy, and Industry StandardsThe acceptable error range for Total Harmonic Distortion (THD) must be evaluated based on specific application contexts, measurement equipment accuracy, and applicable industry standards. Below is a detailed analysis of key performance indicators in power systems, industrial equipment, and general measurement applications.1. Harmonic Error Standar
Edwiin
11/03/2025
Busbar-Side Grounding for 24kV Eco-Friendly RMUs: Why & How
Busbar-Side Grounding for 24kV Eco-Friendly RMUs: Why & How
Solid insulation assistance combined with dry air insulation is a development direction for 24 kV ring main units. By balancing insulation performance and compactness, the use of solid auxiliary insulation allows passing insulation tests without significantly increasing phase-to-phase or phase-to-ground dimensions. Encapsulation of the pole can address the insulation of the vacuum interrupter and its connected conductors.For the 24 kV outgoing busbar, with the phase spacing maintained at 110 mm,
Dyson
11/03/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.