Requirements for enclosure partitioning in GIS design according to IEC standard

Edwiin
Field: Power switch
China

The partitioning of a Gas - Insulated Switchgear (GIS) is significantly influenced by the service continuity requirements during maintenance, repair, and extension activities. Additionally, local health and safety regulations must be taken into account.

GIS should be divided into compartments in a way that:

  • During various operations that necessitate the de - energization of certain parts of the GIS, such as maintenance, repair, and extension, the compartments taken out of service adhere to the user's service continuity requirements.

  • The impact of an internal arc within a compartment is restricted to that specific compartment only.

  • In the event of a major failure, the duration of unavailability aligns with the user's service continuity requirements.

  • Considering the available gas handling equipment, the gas compartment can be evacuated and refilled within a reasonable time frame.

Each compartment must be equipped with:

  • A filling valve.

  • A gas monitoring device.

Based on the GIS design, each compartment may also be equipped with the following accessories:

  • A pressure relief device.

  • A desiccant.

  • An internal fault arc location detector.

The figure provides an example of a partitioning design for different types of adjacent compartments.

Give a tip and encourage the author!

Recommended

Main Transformer Accidents and Light Gas Operation Issues
1. Accident Record (March 19, 2019)At 16:13 on March 19, 2019, the monitoring background reported a light gas action of No. 3 main transformer. In accordance with the Code for Operation of Power Transformers (DL/T572-2010), operation and maintenance (O&M) personnel inspected the on-site condition of No. 3 main transformer.On-site confirmation: The WBH non-electrical protection panel of No. 3 main transformer reported a Phase B light gas action of the transformer body, and the reset was ineff
02/05/2026
Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
01/30/2026
Neutral point grounding operation mode for 110kV~220kV power grid transformers
The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
01/29/2026
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
01/29/2026
Related Products
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.