SF6 decomposition products from electrical arc in gas switchgear

Edwiin
Field: Power switch
China

During the switching of normal load or short-circuit current, SF₆ molecules are ionized and fragmented by the arc. The figure illustrates the main reaction processes and the locations where each process is likely to occur. SF₄, as the primary decomposition product resulting from the electric discharge, first reacts with H₂O on the inner wall surface, giving rise to SOF₂. The metal fluorides remain in the form of powder or dust on the surface. H₂O is released in this reaction and thus becomes available for further reactions with SF₄ or for the much slower conversion of SOF₂ to SO₂. In fact, in this process, H₂O is not consumed but rather acts as a catalyst. The factors involved are as follows:

  • The formation rate of decomposition products as a function of the arc or discharge energy.

  • The transport speed (diffusion or convection) of decomposition products from the arc or discharge location to the walls of the compartment.

  • The gas mixing of decomposition products generated at the surfaces (diffusion or convection).

  • The reaction rate of decomposition products at the wall surfaces.

  • The adsorption rate of decomposition products in the adsorbent materials, which depends on the properties and location of the adsorbent materials.

Give a tip and encourage the author!

Recommended

Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
01/30/2026
Neutral point grounding operation mode for 110kV~220kV power grid transformers
The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
01/29/2026
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
01/29/2026
HECI GCB for Generators – Fast SF6 Circuit Breaker
1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
01/06/2026
Related Products
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.