Annealing Test for Wires and Conductors

Electrical4u
Electrical4u
Field: Basic Electrical
0
China

What Is The Annealing Test For Wires And Conductors

This test is normally carried on annealed copper wires, aluminum wires for welding cables and solid conductors of electric power cables. The current carrier conductors of power cable is subjected to twist and bend during laying and installation hence it should be flexible enough to take any desired bending and twisting without breaking and cracking. Annealing test for wires and conductors is performed to confirm the durability of conductor during twisting and bending.

Process of annealing test for wires and conductors

A specimen of conductor of cable is taken. The specimen should be of at least specified gauge length that is the sampled length of that conductor on which test result is measured. The total length of the specimen should be its gauge length plus the lengths at two ends which are used for holding the specimen by tensile test machine holder grips.

A tension test machine is used for this purpose. The Tensile Testing Machine is an Automatic one, having capacity to meet the requirement of this test and the rate of separation of jaws as specified. The grips shall be such as to firmly hold the test specimen. This test also requires a Plane Faced Micrometer with scale division at least 0.01 mm and a measuring scale with least scale division 1 mm. Here only one specimen of test material is required for performing this test. Moreover the specimen is not required to pre conditioned before test. After the specimen is fixed between grips of the machine, tensile stress is applied gradually and uniformly that means the gap between the grips is increased gradually and uniformly till the specimen conductor gets fractured. The rate of elongation of specimen i.e. rate of increase of gap between grips of the machine should not be more than 100 mm per minute.

The elongation is measured on the gauge length after the fractured ends have been fitted together. The elongation is expressed as a percentage of the original specimen gauge length. Main observation of annealing test for wires and conductors is that whether the specimen meets or does not meet the specified maximum allowed elongation. Plane Faced Micrometer with scale division at least 0.01 mm is used to measure the diameter of the specimen used in the test.
tensile test machineIf L is the length of the specimen and L is the length of the entire specimen after it gets fractured due to elongation. More precisely, L is the summation of the length of two fractured parts of the specimen. Then percentage elongation would be expressed as

Tabulation of Observations of Annealing Test

Diameter of Circular Wire in mm

Size of Shaped Solidal Conductor in mm2

Original Gauge Length, L in mm

Length After

Fracture, L in mm

Elongation (L – L) in mm

Calculation

Where, L = original gauge length of specimen
and L = elongated length of specimen

Report

Sample No

Diameter of Circular Wire

Size of Shaped Solidal Conductor

Elongation, percent




Observed

Specified

Conclution :Specimen meets/does not meet the requirements of specification.

Statement: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Give a tip and encourage the author!
Recommended
THD Measurement Error Standards for Power Systems
THD Measurement Error Standards for Power Systems
Error Tolerance of Total Harmonic Distortion (THD): A Comprehensive Analysis Based on Application Scenarios, Equipment Accuracy, and Industry StandardsThe acceptable error range for Total Harmonic Distortion (THD) must be evaluated based on specific application contexts, measurement equipment accuracy, and applicable industry standards. Below is a detailed analysis of key performance indicators in power systems, industrial equipment, and general measurement applications.1. Harmonic Error Standar
Edwiin
11/03/2025
Busbar-Side Grounding for 24kV Eco-Friendly RMUs: Why & How
Busbar-Side Grounding for 24kV Eco-Friendly RMUs: Why & How
Solid insulation assistance combined with dry air insulation is a development direction for 24 kV ring main units. By balancing insulation performance and compactness, the use of solid auxiliary insulation allows passing insulation tests without significantly increasing phase-to-phase or phase-to-ground dimensions. Encapsulation of the pole can address the insulation of the vacuum interrupter and its connected conductors.For the 24 kV outgoing busbar, with the phase spacing maintained at 110 mm,
Dyson
11/03/2025
How Vacuum Tech Replaces SF6 in Modern Ring Main Units
How Vacuum Tech Replaces SF6 in Modern Ring Main Units
Ring main units (RMUs) are used in secondary power distribution, directly connecting to end-users such as residential communities, construction sites, commercial buildings, highways, etc.In a residential substation, the RMU introduces 12 kV medium voltage, which is then stepped down to 380 V low voltage through transformers. The low-voltage switchgear distributes electrical energy to various user units. For a 1250 kVA distribution transformer in a residential community, the medium-voltage ring m
James
11/03/2025
What Is THD? How It Affects Power Quality & Equipment
What Is THD? How It Affects Power Quality & Equipment
In the field of electrical engineering, the stability and reliability of power systems are of paramount importance. With the advancement of power electronics technology, the widespread use of nonlinear loads has led to an increasingly serious problem of harmonic distortion in power systems.Definition of THDTotal Harmonic Distortion (THD) is defined as the ratio of the root mean square (RMS) value of all harmonic components to the RMS value of the fundamental component in a periodic signal. It is
Encyclopedia
11/01/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.