3D Wound-Core Transformers in China: Technical Trends for Utility Companies

Echo
Echo
Field: Transformer Analysis
China

Technical Requirements and Development Trends for Distribution Transformers

  • Low losses, especially low no-load losses; highlighting energy-saving performance.

  • Low noise, particularly during no-load operation, to meet environmental protection standards.

  • Fully sealed design to prevent transformer oil from contacting external air, enabling maintenance-free operation.

  • Integrated protection devices within the tank, achieving miniaturization; reducing transformer size for easier on-site installation.

  • Capable of loop-network power supply with multiple low-voltage output circuits.

  • No exposed live parts, ensuring safe operation.

  • Compact size and light weight; reliable operation with convenient maintenance and upgrades.

  • Excellent fire resistance, earthquake resistance, and disaster prevention performance, expanding application range.

  • Strong overload capacity, meeting emergency power demands during failures in other equipment.

  • Further reduction in production and sales costs to enhance affordability and market acceptance.

Based on the above analysis, three-dimensional (3D) wound-core distribution transformers represent an ideal development direction. Currently, energy-efficient models such as the S13 and SH15 amorphous alloy distribution transformers best meet domestic market demands. For installations requiring fire safety, dry-type distribution transformers with epoxy resin casting are recommended.

Key Considerations in the Use of Distribution Transformers

Based on the above conclusions and practical experience, the following operational guidelines for distribution transformers can be clearly understood. These are presented as recommendations without detailed technical justification—further discussion can be conducted in specialized topics.

  • When selecting a distribution transformer, consider not only its performance but also appropriate capacity selection based on actual load size to ensure high load utilization.

    • If the capacity is too large, the initial investment and purchase cost increase, and no-load losses are higher during operation.

    • If the capacity is too small, it may fail to meet power demand, and load losses tend to be excessively high.

  • Determine the number of transformers reasonably, considering both safety and economy:

    • For facilities with large amounts of critical (Class I) loads, or even Class II loads requiring high security, consider installing multiple units (e.g., one large and one small) when load fluctuations are significant and long intervals occur.

    • For high reliability requirements, provide a standby transformer (subject to space and other constraints).

    • If lighting and power share one transformer and lighting quality or lamp life is severely affected, a dedicated lighting transformer should be installed.

  • Economic operation of transformers is a complex systemic issue.

    • Maximum efficiency occurs when no-load losses equal load losses—this is difficult to achieve in practice.

    • Consider the economic operation curve and optimal economic operation curve. Generally, transformers operate most efficiently and economically at 45%–75% load rate.

    • However, this varies by transformer type and capacity and should be evaluated individually. Refer to Professor Hu Jingsheng’s book Economic Operation of Transformers for detailed calculations.

  • Reactive power compensation for distribution transformers must be properly managed—neither over-compensation nor under-compensation.

    • Improves power factor

    • Reduces line losses

    • Enhances operating voltage

    • The actual power factor should generally reach 90% or higher.

    • The losses introduced by capacitors themselves must be considered.

    • Proper compensation brings significant energy-saving benefits:

    • Compensation methods include: group compensation, centralized compensation, and local (at-load) compensation.

  • When selecting and operating transformers, pay attention to the secondary output voltage.

    • Consider the system voltage conditions, select the appropriate turns ratio, and correctly set the tap changer position to meet customers' requirements for voltage quality.

  • Strengthen operation and maintenance of distribution transformers.

    • While current systems often adopt a "condition-based maintenance" approach (repair only when defects occur), scientific inspection procedures are essential.

    • Key points include: avoiding long-term overload operation, maintaining proper oil level, normal temperature indication, and acceptable noise levels. Regulations already provide detailed guidance.

  • Other aspects such as safety, civilized production, service life, investment return, and installation location selection also impact transformer use. These topics are not discussed in detail here.

Give a tip and encourage the author!
Recommended
Why is it difficult to increase the voltage level?
Why is it difficult to increase the voltage level?
The solid-state transformer (SST), also known as a power electronic transformer (PET), uses voltage level as a key indicator of its technological maturity and application scenarios. Currently, SSTs have reached voltage levels of 10 kV and 35 kV on the medium-voltage distribution side, while on the high-voltage transmission side, they remain in the stage of laboratory research and prototype validation. The table below clearly illustrates the current status of voltage levels across different appli
Echo
11/03/2025
Standards and Calculation of LTAC Test for Power Transformers
Standards and Calculation of LTAC Test for Power Transformers
1 IntroductionAccording to the provisions of the national standard GB/T 1094.3-2017, the primary purpose of the line terminal AC withstand voltage test (LTAC) for power transformers is to evaluate the AC dielectric strength from the high-voltage winding terminals to ground. It does not serve to assess inter-turn insulation or phase-to-phase insulation.Compared with other insulation tests (such as full lightning impulse LI or switching impulse SI), the LTAC test imposes a relatively more stringen
Oliver Watts
11/03/2025
What Are the Handling Procedures After Transformer Gas (Buchholz) Protection Activation?
What Are the Handling Procedures After Transformer Gas (Buchholz) Protection Activation?
What Are the Handling Procedures After Transformer Gas (Buchholz) Protection Activation?When the transformer gas (Buchholz) protection device operates, a thorough inspection, careful analysis, and accurate judgment must be carried out immediately, followed by appropriate corrective actions.1. When the Gas Protection Alarm Signal is ActivatedUpon activation of the gas protection alarm, the transformer should be inspected immediately to determine the cause of operation. Check whether it was caused
Felix Spark
11/01/2025
Intelligent Electrical Room: Key Development Trends
Intelligent Electrical Room: Key Development Trends
What Is the Future of Intelligent Electrical Rooms?Intelligent electrical rooms refer to the transformation and upgrading of traditional electrical distribution rooms through the integration of emerging technologies such as the Internet of Things (IoT), big data, and cloud computing. This enables 24/7 remote online monitoring of power circuits, equipment conditions, and environmental parameters, significantly improving safety, reliability, and operational efficiency.The development trends of int
Echo
11/01/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.