High Voltage Bushing Selection Standards for Power transformer

James
Field: Electrical Operations
China

1. Structure Forms and Classification of Bushings

The structure forms and classification of bushings are shown in the table below:

Serial No. Classification Feature Category
1 Main insulation structure Capacitive Type Resin-impregnated paper

Oil-impregnated paper

Non-capacitive Type Gas insulation

Liquid insulation

Casting resin

Composite insulation

2 External Insulation Material

Porcelain

Silicone Rubber

3 Filling Material Between Capacitor Core and External Insulation Sleeve Oil-filled Type

Gas-filled Type

Foamed Type

Oil-paste Type

Oil-gas Type

4 Application Medium Oil-Oil

Oil-Air

Oil-SF₆

SF₆-Air

SF₆-SF₆

5 Application Site AC

DC

2. Selection Principles for Bushings

2.1 Basic Selection Principles

2.1.1 The selection of bushings should meet the performance specifications of transformers, such as: maximum equipment voltage, maximum operating current, insulation level, and installation methods, satisfying relevant requirements for safe operation of power grids.

2.1.2 The selection of bushings should also consider other factors, such as:

  • Operating environment: altitude, pollution level, ambient temperature, working pressure, arrangement method;

  • Transformer structure: lead-out method, bushing installation method, total installation height with current transformers;

  • Bushing structure: current carrying method, internal insulation form (oil-impregnated paper or resin-impregnated paper), external insulation sleeve material (porcelain or silicone rubber);

  • Bushing supplier, safety reliability, operational performance and other factors.

2.1.3 The insulation level of bushings should be higher than that of the transformer main body.

2.2 Selection Based on Transformer Rated Voltage Level

2.2.1 When the rated voltage of bushings exceeds 40.5kV, the main insulation structure of bushings should preferably be of condenser type.

2.2.2 When the rated voltage of bushings does not exceed 40.5kV, the main insulation structure of bushings may be either pure porcelain (composite) type or condenser type, depending on specific conditions.

2.3 Selection Based on Current Carrying Method of Bushings

2.3.1 When the rated current of bushings is less than 630A, the current carrying method should preferably be cable-through type.

2.3.2 When the rated current of bushings is not less than 630A or the voltage is not less than 220kV, the current carrying method should preferably be conductor rod type.

2.4 Selection Based on Transformer Operating Conditions

2.4.1 When the transformer operating location has normal environmental conditions, standard specification bushings provided by the bushing supplier should be directly selected.

2.4.2 When the transformer operating location is at an altitude greater than 1000m, bushings with external insulation dimensions calibrated according to GB/T4109 should be selected. For parts of bushings immersed in oil or SF6 medium, their breakdown field strength and flashover voltage are not affected by altitude, so insulation distances do not require calibration.

The internal insulation level of bushings is unrelated to altitude effects and does not require calibration. (Note: Due to limitations of breakdown strength and flashover voltage in the immersed medium parts, bushings used in high-altitude areas cannot be verified by testing at lower altitudes to confirm whether the increased arcing distance is sufficient. Therefore, bushing suppliers should demonstrate that the increased external insulation arcing distance of bushings is adequate.)

2.4.3 The maximum phase voltage of power grid systems may exceed Um/√3. When this condition does not exceed 8 hours cumulatively within any 24-hour period and 125 hours annually, bushings should be able to operate at the following voltage values:

image.png

For systems where operating voltage may exceed the values mentioned above, bushings with higher Um values should be selected.

2.4.4 For transformers with higher seismic performance requirements, dry-type bushings are recommended.

2.5 Selection Based on Transformer Insulation Medium Type

2.5.1 When the transformer's internal insulation medium uses transformer oil and is directly connected to overhead lines externally, oil-air structure bushings should be selected.

2.5.2 When the transformer's internal insulation medium uses transformer oil and is directly connected to external GIS, oil-SF6 structure dry-type bushings should be selected.

2.5.3 When the transformer's internal insulation medium uses SF6 gas and the external insulation is air, SF6-air structure dry-type bushings should be selected.

2.5.4 When both the internal and external insulation media of the transformer use transformer oil, oil-oil structure bushings should be selected.

2.6 Selection for Converter Transformer Valve Applications

For valve-side AC/DC bushings, resin-impregnated paper type AC/DC bushings or SF6-filled oil-paper capacitance type AC/DC bushings are recommended.

2.7 Selection for Oil-Immersed Smoothing Reactor Applications

For oil-immersed smoothing reactors, resin-impregnated paper type DC bushings or SF6-filled oil-paper capacitance type DC bushings are recommended for the valve hall side.

2.8 Selection for Online Monitoring Applications

When implementing online monitoring for bushings, bushings with voltage taps should be selected.

Give a tip and encourage the author!
Recommended
HECI GCB for Generators – Fast SF6 Circuit Breaker
1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
01/06/2026
Design Principles for Pole-Mounted Distribution Transformers
Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
12/25/2025
Transformer Noise Control Solutions for Different Installations
1.Noise Mitigation for Ground-Level Independent Transformer RoomsMitigation Strategy:First, conduct a power-off inspection and maintenance of the transformer, including replacing aged insulating oil, checking and tightening all fasteners, and cleaning dust from the unit.Second, reinforce the transformer foundation or install vibration isolation devices—such as rubber pads or spring isolators—selected based on the severity of vibration.Finally, strengthen sound insulation at weak points of the ro
12/25/2025
Rockwill Passes Single-Phase Ground Fault Test for Smart Feeder Terminal
Rockwill Electric Co., Ltd. has successfully passed the real-scenario single-phase-to-ground fault test conducted by the Wenzhou of China Electric Power Research Institute for its DA-F200-302 hood-type feeder terminal and integrated primary-secondary pole-mounted circuit breakers—ZW20-12/T630-20 and ZW68-12/T630-20—receiving an official qualified test report. This achievement marks Rockwill Electric as a leader in single-phase ground fault detection technology within distribution networks.The DA
12/25/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.