• 10kV 12kV 35kV transmission substation outdoor combined electrical compact substation
  • 10kV 12kV 35kV transmission substation outdoor combined electrical compact substation
10kV 12kV 35kV transmission substation outdoor combined electrical compact substation
discuss personally
Model
ZGS-35
ZGS-50
ZGS-10
Basic info
Brand Vziman
Model NO. 10kV 12kV 35kV transmission substation outdoor combined electrical compact substation
Rated voltage 10kV
Rated frequency 50/60Hz
Series ZGS
Product Detail

Product Overview

The Compact Secondary Substation (CSS) is a highly integrated outdoor power facility, enclosing medium-voltage (MV) switchgear, distribution transformers, low-voltage (LV) switchboards, and auxiliary equipment within a single protective enclosure. It supports power conversion from 10-35kV MV input to 0.4kV LV output. Featuring modular design with arc-test certified components, its enclosure meets IP54+ protection standards, allowing direct installation in public-access areas like communities and commercial parks.
Type-tested for insulation strength and short-circuit withstand capability, the CSS incorporates an arc protection system and intelligent monitoring modules for remote condition surveillance. It completes full-process power conversion from high-voltage intake to low-voltage distribution in a compact footprint, delivering safe and reliable end-point power solutions for urban distribution networks.
Feature
  • Highly Integrated:Combines MV switchgear, transformer, and LV panel in a single enclosure, reducing footprint by 40%-60%. Directly converts 10-35kV to 0.4kV in one compact unit.
  • Modular Expandability:Standardized design with MV/transformer/LV compartments. Capacity adjustable from 500-2000kVA. Easy upgrades via module replacement.
  • Robust Safety Protection:IP54+ enclosure, arc-tested components, 42kV 1-minute AC withstand voltage, 31.5kA short-circuit tolerance.
  • Smart Monitoring:Real-time oil temperature/load monitoring. RS485/Ethernet interfaces for remote fault alerting.
  • Safe & Eco-Friendly:Noise reduction ≤55dB, landscape-friendly enclosure, anti-shock design compliant with IEC 62271-200.
  • Energy-Efficient & Reliable:Low-loss silicon steel core reduces no-load losses by 30%. MTBF exceeds 100,000 hours.
  • Rapid Installation:Prefabricated for 50% shorter on-site setup. Flexible deployment on slopes, narrow spaces.
Technical Parameters
 
Know your supplier
Vziman
Zhejiang Vziman Electric Group Co., Ltd. is a high-tech enterprise specializing in R&D, manufacturing, and service of power electrical equipment. Committed to innovation, quality, and customer satisfaction, it supplies smart solutions for global power sectors, covering grid construction, new energy, and industrial distribution. Core Business • Switchgear (GIS, circuit breakers, Recloser, Load break switch) • Distribution equipment (transformers, RMU, smart terminals) • Power automation systems • Engineering services (installation, maintenance, consulting) Technical Strength • Provincial R&D center, multiple patents • Modern production, ISO/GB/IEC/CE/UL certified • High capacity, large-scale delivery support Market & Vision Serves State Grid, Southern Grid, and global projects (Asia, Africa, Europe, etc.). Aims to lead in smart grids and new energy, promoting sustainable energy development.
Main Categories
High Voltage Electrical Apparatus
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150000000
Professional Experience
3 years
Workplace
10000m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!