• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


5KW High-performs hybrid PV inverter

  • 5KW High-performs hybrid PV inverter
  • 5KW High-performs hybrid PV inverter

Key attributes

Brand RW Energy
Model NO. 5KW High-performs hybrid PV inverter
Mounting type rackmounting
Rated Output Rating 5kW
Input Voltage DC48V
Rated PV input power 5.5kW
Series PC/PW PLUS

Product descriptions from the supplier

Description

Photovoltaic inverter

PCW-en.png

Peculiarity

♦ Dual phase inverter.

♦ Up to 9 parallel machines, the output power can reach 45KW.

♦ Three parallel machines can be set up three-phase power supply

♦ Backward compatible with traditional lead batteries, colloidal batteries.

♦ The panel integrates a variety of interfaces, supporting a variety of protocols of the host computer and battery pack.

♦ Integrated MPPT, maximize the press of the remaining power of the photovoltaic panel.

♦ Highly integrated, feature-rich, one machine at most.

♦ PC PLUS-5 Standard 4U rack specifications.

♦ Can be customized adjustment management battery charging and discharging strategy.

♦ Modular design, easy maintenance.

Technical parameter

image.png

image.png

Documentation Resource Library
Public.
High-performs Commercial hybrid inverter selection catalog
Catalogue
English
FAQ
Q: How does a PV inverter work?
A:

PV inverter is a high-performance device that primarily converts the DC generated by solar panels into AC.

  • DC Input: The DC power produced by solar panels is connected to the inverter's input via cables.

  • Maximum Power Point Tracking (MPPT): The inverter incorporates Maximum Power Point Tracking technology, which dynamically adjusts the input voltage and current to ensure the maximum energy output under varying light conditions.

  • Pulse Width Modulation (PWM): PWM technology is used to generate an AC waveform that approximates a sine wave. The power electronic devices inside the inverter, such as IGBT or MOSFET, switch on and off according to certain rules to produce AC.

  • AC Output: The generated AC power is filtered to remove high-frequency noise and is stabilized through voltage regulation circuits to ensure stable output voltage and frequency.

  • Grid-Tie Function: For grid-tied inverters, the output AC power can be fed directly into the electrical grid for residential or commercial use.

Q: Does the PC PLUS-5 have to be installed on a 4U rack?
A:

This model is designed according to the standard 4U rack specifications and is recommended for cabinet integration scenarios such as communication base stations and small data centers; If wall mounted, please confirm the structural load-bearing capacity and heat dissipation space.

Q: Does the MPPT input power of 5.5kW mean that it can be connected to a super matched photovoltaic panel?
A:

Correct. Allow photovoltaic modules to be overloaded to 5.5 kW (DC) to increase power generation and improve system ROI under weak light or low temperature and high irradiation conditions in the morning and evening.

Q: Supports up to 9 parallel devices, are all functions synchronized?
A:

Yes, it is. Through the master-slave control architecture, 9 devices can achieve power sharing, unified charging and discharging strategies, and fault linkage protection; Any 3 units can also be configured as three-phase outputs to meet the needs of small three-phase loads.

Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 30000m² Total staff: Highest Annual Export(usD): 100000000
Workplace: 30000m²
Total staff:
Highest Annual Export(usD): 100000000
Services
Business Type: Design/Manufacture/Sales
Main Categories: High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Instrument meters/New energy/Tester/Robot
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
    Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
    01/30/2026
  • Neutral point grounding operation mode for 110kV~220kV power grid transformers
    The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
    01/29/2026
  • Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
    Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
    01/29/2026
  • Why Must a Transformer Core Be Grounded at Only One Point? Isn't Multi-Point Grounding More Reliable?
    Why Does the Transformer Core Need to Be Grounded?During operation, the transformer core, along with the metal structures, parts, and components that fix the core and windings, are all situated in a strong electric field. Under the influence of this electric field, they acquire a relatively high potential with respect to ground. If the core is not grounded, a potential difference will exist between the core and the grounded clamping structures and tank, which may lead to intermittent discharge.I
    01/29/2026
  • Understanding Transformer Neutral Grounding
    I. What is a Neutral Point?In transformers and generators, the neutral point is a specific point in the winding where the absolute voltage between this point and each external terminal is equal. In the diagram below, pointOrepresents the neutral point.II. Why Does the Neutral Point Need Grounding?The electrical connection method between the neutral point and earth in a three-phase AC power system is called theneutral grounding method. This grounding method directly affects:The safety, reliabilit
    01/29/2026
  • What’s the Difference Between Rectifier Transformers and Power Transformers?
    What is a Rectifier Transformer?"Power conversion" is a general term encompassing rectification, inversion, and frequency conversion, with rectification being the most widely used among them. Rectifier equipment converts input AC power into DC output through rectification and filtering. A rectifier transformer serves as the power supply transformer for such rectifier equipment. In industrial applications, most DC power supplies are obtained by combining a rectifier transformer with rectifier equ
    01/29/2026

Related Solutions

  • Distribution automation systems solutions
    What are the difficulties in overhead line operation and maintenance?Difficulty one:Overhead lines of distribution network have wide coverage,complicatedterrain,many radiation branches and distributed power supply,resultingin "many line faults and difficulty in fault troubleshooting".Difficulty Two:Manual troubleshooting is time-consuming and laborious.Meanwhile,therunning current,voltage and switching state of the line cannot be graspedin real time,because of the lack of intelligent technical m
    04/22/2025
  • RW8000 DMS Distribution Management System Solutions
    OverviewNowadays, the development trend of power grid is intellectualization. As an important part of power grid, the power distribution system is very close to the customers and it has to run properly. The distribution management system (DMS)played an important role in it.Introduction:RW8000 power distribution management system (DMS) is designed for the smart grids. It is based on real-time application, centered on distribution network operation and management, focusing on the business process
    09/07/2023
  • High-Precision Electrical Parameter Monitoring System Solution
    1.Introduction​With the increasingly stringent requirements for power supply quality in high-end facilities such as precision manufacturing, medical diagnosis, and data centers, traditional power monitoring systems, due to their low sampling accuracy and weak data analysis capabilities, can no longer meet the demand for deep insight and precise management of power quality. In response, we are introducing a new generation ​High-Precision Electrical Parameter Monitoring System. With ​millisecond-l
    09/28/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.