• AC Load Bank 380VAC 40A
AC Load Bank 380VAC 40A
discuss personally
Model
LB-480/40
LB-230/40
LB-220/40
LB-380/40
Basic info
Brand Wone
Model NO. AC Load Bank 380VAC 40A
Rated voltage 380V
Rated normal current AC 40A
Series LB
Product Detail

Feature

  • It can reach the electrical parameters of high power (1kW to 10MW),high voltage ( AC 110V to 690V) or high current (10000A or more).

  • According to the needs to design the load steps,configure intelligent digital display meter,all protections can be configured optionally (Overheating alarm, Short circuit protection, Overheating protection, Fan overloading protection, Emergency stop button etc.).

  • In addition, our water-cooled load banks can also be equipped with cooling system and water tower.Customized solutions could be available upon request.


Load Bank  Structure


  • When a single resistor can't meet load demand, multiple resistors are combined in series and parallel to increase power to meet the requirements.

  •  The internal load resistors are circularly cooled by the axial fans.

  • The types of load built-in resistors are: high power wire wound resistors, aluminum housed resistors, high energy resistors, plate resistors, stainless steel resistors, high voltage resistors.

Notes

  • There shall be no flammable and explosive corrosive medium in the installation scope.

  • Connect the load and instrument power supply according to the identification on the equipment panel. After confirming that the voltage is normal, turn on the instrument power switch on the enclosure. At this time, all instruments display "0", all fans operate normally, and connect the load power supply .

  •  To ensure safety, please do not touch the cabinet surface (except the panel) to prevent scalding.

  •  After the load bank stops working, please delay 30 minutes to turn off the power supply of the fans, so as to avoid the accumulation of high temperature causing damage to other parts (such as instruments, switches, etc.)

  •  There will be light smoke when the load is used for the first time,which is a normal phenomenon that silicone resin volatilizes when it meets high temperature medium.


Application Area

Generator test, power supply equipment, battery test, frequency converter, elevator, sub arc welding machine, lifting machinery, construction machinery, ship, rolling mill, wire drawing machine, centrifuge, UPS power supply, pulse load application, winch, generator, transformer, starting, braking, speed regulation and load test, as well as medical, railway, automobile, military and industrial control environment, etc.

Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!