• CSD Series marine transformers
  • CSD Series marine transformers
  • CSD Series marine transformers
  • CSD Series marine transformers
CSD Series marine transformers
discuss personally
Model
CSD-1600
CSD-1250
CSD-1000
CSD-800
CSD-630
CSD-500
CSD-400
CSD-315
CSD-250
CSD-200
CSD-160
CSD-125
CSD-100
CSD-80
CSD-63
CSD-50
CSD-40
CSD-35
CSD-30
CSD-25
CSD-20
CSD-16
CSD-10
CSD-7.5
CSD-5
CSD-3
Basic info
Brand POWERTECH
Model NO. CSD Series marine transformers
Rated capacity 160kVA
Primary voltage 6kV
Secondary voltage 0.4kV
Series CSD Series
Product Detail

Overview

1. The transformers are designed and manufactured according to IEC60076 standards. The products have been certified by CCS,ABS, BV, DNV, GL, RS, RINA, LR, and other ship classification societies, and have obtained corresponding ship inspection certificates.
2. The transformer core uses high-quality cold-rolled silicon steel sheets from Baowu Group, cut and assembled using a se ven-step 45° fully inclined seam process. No-load loss, no-load current, and operating noise are all superior to national and industry standards, effectively reducing product weight, size, and greatly reducing transformer inrush current during energization.
3. For the CSCBD series marine transformers, the windings use epoxy resin casting technology. ANSYS simulation technology is applied for multi-physics field coupling simulation, ensuring winding structural strength and optimizing cooling air ducts, effectively reducing winding hot spot temperature and improving the transformer's overload capacity.
4. The transformer case is made of 2.0mm cold-rolled steel plate. High-temperature silicone rubber strips are used for sealing between the frame and movable panels, meeting protection class requirements while effectively reducing vibration noise. The case meets C5M anticorrosion standards, with corrosion resistance, weather resistance, and UV resistance. The coating is crack-resistant and wear-resistant.
5. The transformer can be equipped with intelligent components to monitor its operating status in real-time, including real-time power transmission, operating voltage and current, operating temperature, insulation performance monitoring, etc. When any of these perf ormance parameters are abnormal, it can output a switch alarm signal. It has a "black bo x" function, allowing all operating parameters to be viewed in real-time on the cloud.

 

Environmental Conditions for Used

Altitude: ≤ 2000m (products for altitudes above 2000m can be customized)
Ambient temperature: -40℃ ~+55℃
Relative humidity: ≤ 95%

 

Applications:

CSD/CDD series marine transformers are used on ships and off shore platforms. Their main purpose is t o provide lighting and power supply for ships or offshore platforms, as well as safety isolation, voltage conversion, and energy transmission. They can also be used in shaft generator systems for voltage conversion and energy transmission. Marine transformers play a crucial role in ensuring the normal operation of power systems on ships and offshore platforms.

 

If you need to know about more parameters, Please check the model selection manual.↓↓↓

Or you are welcome to contact us.↓↓↓

Know your supplier
POWERTECH
We are an electrical company that manufactures and sells high and low voltage electrical products.
Main Categories
High Voltage Electrical Apparatus
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$120000000
Professional Experience
7 years
Workplace
580000m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!