• Fuse links for expulsion fuse cutout
  • Fuse links for expulsion fuse cutout
Fuse links for expulsion fuse cutout
discuss personally
Model
K-200
K-100
K-50
K-10
Basic info
Brand Wone
Model NO. Fuse links for expulsion fuse cutout
Rated capacity of transformer 200kVA
Full load current of transformer 11.55A
Series Fuse Links
Product Detail

Characteristic brief :

Type K, type T, type H and type SLOW-FAST fuse link manufacture and test according to the latest international standard IEC 60282-2:2008 & IEEE Std C37.41-2008 & IEEE Std C37.42-2009.

  • Fusible element adopts the material of silver-copper alloy.Using precision technology and strict testing to guarantee accurate characteristics of time-current.

  • Fusible element be crimping to fasten cable wire,and fixed by high strength strain wire.That guarantee excellent mechanical strength.it will not be affected,even if under external factors such as vibration and high current impact.

  • The Arc extinguishing tube has excellent performance of arc extinguishing when low current overload fault.

  • We also supply Type K and Type T twin pigtails fuse link, The twin pigtails fuse link is convenient and easier to install in the fuse cutout than conventional single pigtail fuse links. The twin pigtails attach under the attachment stud on each side separately.

Technical Parameters:

Type K Fuse Links:

企业微信截图_17338814888284.png

企业微信截图_17338816245661.png

  • 11-15kv Fuse link length 21'(533mm)

  • 24-27kv Fuse link length 23'(584mm)

  • 33-38kv Fuse link length 31'(787mm)

Type T Fuse Links:

企业微信截图_17338818114885.png

企业微信截图_17338818843772.png

  • 11-15kv Fuse link length 21'(533mm)

  • 24-27kv Fuse link length 23'(584mm)

  • 33-38kv Fuse link length 31'(787mm)

Type H Fuse Links:

企业微信截图_17338821717890.png

企业微信截图_17338838215703.png

  • 11-15kv Fuse link length 21'(533mm)

  • 24-27kv Fuse link length 23'(584mm)

  • 33-38kv Fuse link length 31'(787mm)

Type Slofast Fuse Links:

企业微信截图_17338840182461.png

企业微信截图_17338840669200.png


  • 11kv Fuse link leght 21'(533mm)

  • 27kv Fuse link leght 23'(584mm)

  • 33kv Fuse link leght 31'(787mm)

Type K Fuse Link Selection For Using Of Distribution Transformer Protection.The corresponding fuse is selected according to the time-current characteristics of the transformer,usually according to the rated current of the transformer.

企业微信截图_17338842458745.png


NOTE: Rated capacity of transformer <160kVA,the rated current of the selected fuse links should be 2-3 times of the full load current of the transformer. Rated capacity of transformer >160kVA,the rated current of the selected fuse links should be 1.5-2 times of the full load current of the transformer.

企业微信截图_17338843025724.png

企业微信截图_1733884296907.png

企业微信截图_17338842907752.png



Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!