• Fuse links for expulsion fuse cutout
  • Fuse links for expulsion fuse cutout
Fuse links for expulsion fuse cutout
discuss personally
Model
K-200
K-100
K-50
K-10
Basic info
Brand Wone
Model NO. Fuse links for expulsion fuse cutout
Rated capacity of transformer 100kVA
Full load current of transformer 5.77A
Series Fuse Links
Product Detail

Characteristic brief :

Type K, type T, type H and type SLOW-FAST fuse link manufacture and test according to the latest international standard IEC 60282-2:2008 & IEEE Std C37.41-2008 & IEEE Std C37.42-2009.

  • Fusible element adopts the material of silver-copper alloy.Using precision technology and strict testing to guarantee accurate characteristics of time-current.

  • Fusible element be crimping to fasten cable wire,and fixed by high strength strain wire.That guarantee excellent mechanical strength.it will not be affected,even if under external factors such as vibration and high current impact.

  • The Arc extinguishing tube has excellent performance of arc extinguishing when low current overload fault.

  • We also supply Type K and Type T twin pigtails fuse link, The twin pigtails fuse link is convenient and easier to install in the fuse cutout than conventional single pigtail fuse links. The twin pigtails attach under the attachment stud on each side separately.

Technical Parameters:

Type K Fuse Links:

企业微信截图_17338814888284.png

企业微信截图_17338816245661.png

  • 11-15kv Fuse link length 21'(533mm)

  • 24-27kv Fuse link length 23'(584mm)

  • 33-38kv Fuse link length 31'(787mm)

Type T Fuse Links:

企业微信截图_17338818114885.png

企业微信截图_17338818843772.png

  • 11-15kv Fuse link length 21'(533mm)

  • 24-27kv Fuse link length 23'(584mm)

  • 33-38kv Fuse link length 31'(787mm)

Type H Fuse Links:

企业微信截图_17338821717890.png

企业微信截图_17338838215703.png

  • 11-15kv Fuse link length 21'(533mm)

  • 24-27kv Fuse link length 23'(584mm)

  • 33-38kv Fuse link length 31'(787mm)

Type Slofast Fuse Links:

企业微信截图_17338840182461.png

企业微信截图_17338840669200.png


  • 11kv Fuse link leght 21'(533mm)

  • 27kv Fuse link leght 23'(584mm)

  • 33kv Fuse link leght 31'(787mm)

Type K Fuse Link Selection For Using Of Distribution Transformer Protection.The corresponding fuse is selected according to the time-current characteristics of the transformer,usually according to the rated current of the transformer.

企业微信截图_17338842458745.png


NOTE: Rated capacity of transformer <160kVA,the rated current of the selected fuse links should be 2-3 times of the full load current of the transformer. Rated capacity of transformer >160kVA,the rated current of the selected fuse links should be 1.5-2 times of the full load current of the transformer.

企业微信截图_17338843025724.png

企业微信截图_1733884296907.png

企业微信截图_17338842907752.png



Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
An Intelligent Device for Insulation Restoration of Low-Voltage Overhead Cables
An Intelligent Device for Insulation Restoration of Low-Voltage Overhead Cables
1. Current Situation and ProblemsLow - voltage overhead cables often suffer insulation damage. Urbanization and infrastructure construction expose them to complex environments (construction, severe weather like strong winds/rains causing scratches or impacts, animal damage), easily breaking insulation layers. Long - term operation also degrades insulation due to aging, corrosion, and prolonged sunlight—e.g., cables in old communities age and crack, raising failure risks.Existing restoratio
Dyson
07/29/2025
Research on Cable Laying and Wiring Construction Technology of Photovoltaic Power Station
Research on Cable Laying and Wiring Construction Technology of Photovoltaic Power Station
1 Research on Cable Laying and Wiring Construction Technology of Photovoltaic Power Station1.1 Data CollectionBefore constructing the BIM model for cable laying, it is necessary to deeply master the detailed parameters of the involved equipment specifications, materials used in construction, and site conditions, aiming to improve the accuracy of model construction. To ensure that the BIM model can accurately reflect the actual situation of the construction site, the core lies in accurately colle
Echo
07/29/2025
Cable Detection and Analysis of Integrated Wiring System in Intelligent Buildings
Cable Detection and Analysis of Integrated Wiring System in Intelligent Buildings
The integrated wiring system of intelligent buildings, as the core carrier of information transmission, functions like a "nervous system." It connects signals such as voice, data, and images, enabling device interconnection and efficient information transmission. Cable detection is a key link to ensure system performance and information security, focusing on index detection, problem troubleshooting, and response measures.1. Core Cable Detection Indicators1.1 Appearance and Identification Verific
Oliver Watts
07/29/2025
What are the key points for quality control in the installation of communication cables in protective spaces?
What are the key points for quality control in the installation of communication cables in protective spaces?
In the context of deep integration of informatization and intelligence, protective spaces, as core carriers of critical communication systems, their stability and safety directly impact information transmission reliability and infrastructure operational efficiency. Thus, analyzing core difficulties (environmental adaptability matching, electromagnetic compatibility design, construction precision control) in communication cable installation in protective spaces holds significant engineering value
James
07/29/2025
What are the basic processes and key points in transformer simulation design?
What are the basic processes and key points in transformer simulation design?
1 IntroductionWhether using any finite element analysis software (such as COMSOL, Infolytica, or Ansys) for transformer simulation analysis—whether focusing on electric field, magnetic field, flow field, mechanical field, or acoustic field—the basic process is roughly the same. A true understanding of the key points in each process is the foundation for the success of the simulation analysis and the reliability of the final results.2 Basic Simulation ProcessA scientific and complete
Ron
07/29/2025
Sharing of Transformer Concepts and Terminology
Sharing of Transformer Concepts and Terminology
Sharing of Transformer Concepts and TerminologyThe zero-mode impedance of a load is infinite, and its line-mode impedance is also extremely large, approximately 100 times that of the line-mode impedance of the line.The capacitance to ground of a cable is 25-50 times that of an overhead line.The free oscillation frequency of transient capacitive current: 300-1500Hz for overhead lines and 1500-3000Hz for cables.Performance requirements for an external grounding transformer: Under normal power supp
Edwiin
07/28/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!