• High Voltage Current-Limiting Fuse(For full range&transformer protection)
  • High Voltage Current-Limiting Fuse(For full range&transformer protection)
High Voltage Current-Limiting Fuse(For full range&transformer protection)
discuss personally
Model
XRNT-36/50
XRNT-24/40
XRNT-24/100
XRNT-7.2/200
XRNT-7.2/100
XRNT-7.2/40
Basic info
Brand Wone
Model NO. High Voltage Current-Limiting Fuse(For full range&transformer protection)
Rated voltage 7.2kV
Rated normal current 100A
Breaking capacity 63kA
Series Current-Limiting Fuse
Product Detail

Characteristic brief :

  • Rated voltage from 7.2KV to 40.5KV.

  • Wide range of rated current from 6.3A to 200A.

  • Full range performance options available at 12KV and 24KV.

  • Powerful pyrotechnic or spring striker.

  • H.R.C.

  • Gurrent-limiting.

  • Low power dissipation,low temperature rise.

  • Operation extremely quickly,high reliability.

  • With primary coil of transformer in series.

  • Isolating & protecting transformer.

  • Conforming to standards: GB15166.2 DIN43625 BS2692-1 IEC60282-1.

Model illustration:

企业微信截图_17338104044634.png

Technical Parameters:

企业微信截图_17338105507832.png

企业微信截图_17338106475852.png

External&installation dimensions(Unit:tmm)


企业微信截图_17338107374503.png

XRNT Fuse link

企业微信截图_17338107428451.png


XRNT -12KV/ Fuse base

企业微信截图_17338107481513.png

XRNT -40.5KV/ Fuse base

What are the structural features of the high-voltage current-limiting fuses (for the full range and transformer protection)?

Fusible Element Structure:

  • The fusible element is a critical component, typically made from materials with high conductivity and a low melting point, such as silver or copper alloys. Its design is intricate, often featuring multiple narrowed sections that will melt first when subjected to overload or short-circuit currents. This design enables the fuse to respond rapidly to fault currents, effectively limiting the rise in current.

Arc-Quenching Medium and Device:

  • The interior is filled with arc-quenching media such as quartz sand. Quartz sand possesses excellent insulation and thermal conductivity properties. When the fusible element melts and an arc is generated, the quartz sand absorbs the heat from the arc, rapidly cooling and extinguishing it, thereby interrupting the current flow and preventing damage from sustained arcing.

Enclosure Material and Sealing:

  • The enclosure is generally made from high-strength ceramics or composite insulating materials. Ceramic enclosures offer superior insulation performance and mechanical strength, capable of withstanding the pressure generated during internal arc quenching. Additionally, the excellent sealing performance prevents external environmental factors (such as moisture and dust) from affecting the internal arc-quenching medium and the fusible element.


Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!