DC Charging Pile Enclosure Electrification Fault Inspection

Felix Spark
Felix Spark
Field: Failure and maintenance
China

 1. Fault Cases

Case 1 (July 16, 2024)

A district manager got a report of a charging pile outage at a square, affecting users and appliances. I, with O&M staff, found the pile was dead but charged EVs normally—yet the neutral wire/cabinet was live.

Inspection steps:

  • Relays, contactors, AC contactors checked → switching power supply had no output.

  • Inverter, fuse, AC power tested → live current detected.

  • Internal check: AC power and modules normal; secondary wiring intact.

  • Cooling fan test: Fan ran but was live. Replacing a faulty fan (damaged coil, leakage) restored full function (8.5kW load, 4 - hour test).

Case 2 (August 5, 2024)

A village user reported a dead display/non - charging pile. Local O&M restarted it unsuccessfully, so I called for support.

Company O&M found:

  • Abnormal three - phase voltage (L1 - N: 0V; L2/L3 - N: 360V; L1 - L3: 360V) → suspected phase fault.

  • Auxiliary switch: stable components but unstable voltage. Reconnection/test still left neutral/ground live. Pole - climbing adjustments and equipment replacement failed.

Via coordination and villagers’ info, we learned the former farmland’s underground cables were damaged (likely from poor construction/stone rolling). Replacing 30+ meters of 35mm² cable fixed voltages/electronics. The fault traced to the transformer - to - pile cable; replacing the main cable restored normalcy.

2. Fault Analysis

  • Case 1: Cooling fan insulation failure (leakage). Fan issues (non - rotation, noise) stem from inherent quality defects.

  • Case 2: Non - standard construction (no proper piping, no “buried cable” mark). The civil team failed to contact O&M or report post - work, causing the fault.

3. Lessons & Tips

For front - line workers, regular checks, careful observation, and timely defect fixes are key (these faults had early signs but worsened due to neglect). Root - cause analysis needs on - site context/construction history.

Suggestions:

  • Connect auxiliary power from the main switch output; add residual current - protected breakers for hierarchical control. Build a platform for fault monitoring.

  • Construction: Follow drawings strictly. Design inspection interfaces; use protected switches. Manage processes and pre - commissioning checks.

  • Regular O&M patrols. Clarify team roles; ban excavator work above pile cables.

  • Manufacturers: Fast after - sales response. Do annual preventive tests; enforce accountability for faults.

Give a tip and encourage the author!
Recommended
Hydraulic Leak & SF6 Gas Leakage in Circuit Breakers
Hydraulic Leak & SF6 Gas Leakage in Circuit Breakers
Leakage in Hydraulic Operating MechanismsFor hydraulic mechanisms, leakage can cause short-term frequent pump starting or excessively long re-pressurization time. Severe internal oil seepage in valves may lead to pressure loss failure. If hydraulic oil enters the nitrogen side of the accumulator cylinder, it can cause abnormal pressure rise, which affects the safe operation of SF6 circuit breakers.Apart from failures caused by damaged or abnormal pressure detection devices and pressure component
Felix Spark
10/25/2025
10kV RMU Common Faults & Solutions Guide
10kV RMU Common Faults & Solutions Guide
1.Application Issues and Handling Measures for 10kV Ring Main Units (RMUs)The 10kV ring main unit (RMU) is a core power distribution device in urban 10kV distribution networks, widely used in industrial parks, residential communities, commercial centers, and public facilities for medium-voltage power supply and flexible power distribution. Its primary function is to enable flexible energy distribution, ring-fed operation, and fault isolation at the 10kV voltage level. However, during long-term o
Echo
10/20/2025
HV Breaker Fault Basics: Training Guide for New Engineers
HV Breaker Fault Basics: Training Guide for New Engineers
High-Voltage Circuit Breakers: Classification and Fault DiagnosisHigh-voltage circuit breakers are critical protective devices in power systems. They rapidly interrupt current when a fault occurs, preventing damage to equipment from overloads or short circuits. However, due to long-term operation and other factors, circuit breakers may develop faults that require timely diagnosis and troubleshooting.I. Classification of High-Voltage Circuit Breakers1. By Installation Location: Indoor-type: Insta
Felix Spark
10/20/2025
10 Prohibitions for Transformer Installation and Operation!
10 Prohibitions for Transformer Installation and Operation!
10 Prohibitions for Transformer Installation and Operation! Never install the transformer too far away—avoid placing it in remote mountains or wilderness. Excessive distance not only wastes cables and increases line losses, but also makes management and maintenance difficult. Never choose transformer capacity arbitrarily. Selecting the right capacity is essential. If the capacity is too small, the transformer may be overloaded and easily damaged—overloading beyond 30% should not exceed two hours
James
10/20/2025
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.