 1. Fault Cases

Case 1 (July 16, 2024)

A district manager got a report of a charging pile outage at a square, affecting users and appliances. I, with O&M staff, found the pile was dead but charged EVs normally—yet the neutral wire/cabinet was live.

Inspection steps:

  • Relays, contactors, AC contactors checked → switching power supply had no output.

  • Inverter, fuse, AC power tested → live current detected.

  • Internal check: AC power and modules normal; secondary wiring intact.

  • Cooling fan test: Fan ran but was live. Replacing a faulty fan (damaged coil, leakage) restored full function (8.5kW load, 4 - hour test).

Case 2 (August 5, 2024)

A village user reported a dead display/non - charging pile. Local O&M restarted it unsuccessfully, so I called for support.

Company O&M found:

  • Abnormal three - phase voltage (L1 - N: 0V; L2/L3 - N: 360V; L1 - L3: 360V) → suspected phase fault.

  • Auxiliary switch: stable components but unstable voltage. Reconnection/test still left neutral/ground live. Pole - climbing adjustments and equipment replacement failed.

Via coordination and villagers’ info, we learned the former farmland’s underground cables were damaged (likely from poor construction/stone rolling). Replacing 30+ meters of 35mm² cable fixed voltages/electronics. The fault traced to the transformer - to - pile cable; replacing the main cable restored normalcy.

2. Fault Analysis

  • Case 1: Cooling fan insulation failure (leakage). Fan issues (non - rotation, noise) stem from inherent quality defects.

  • Case 2: Non - standard construction (no proper piping, no “buried cable” mark). The civil team failed to contact O&M or report post - work, causing the fault.

3. Lessons & Tips

For front - line workers, regular checks, careful observation, and timely defect fixes are key (these faults had early signs but worsened due to neglect). Root - cause analysis needs on - site context/construction history.

Suggestions:

  • Connect auxiliary power from the main switch output; add residual current - protected breakers for hierarchical control. Build a platform for fault monitoring.

  • Construction: Follow drawings strictly. Design inspection interfaces; use protected switches. Manage processes and pre - commissioning checks.

  • Regular O&M patrols. Clarify team roles; ban excavator work above pile cables.

  • Manufacturers: Fast after - sales response. Do annual preventive tests; enforce accountability for faults.