What are the polarity test methods for GIS current transformers?

Oliver Watts
Oliver Watts
Field: Inspection and testing
China

I’m Oliver, an 8 - year current transformer testing pro. Today, let’s break down new and old polarity test methods for GIS current transformers—how they work and their pros/cons.

1.Testing Methods
1.1New Method

  • Pre - test ops: Open FDS21/FDS22 fast disconnectors + DS23 disconnector. Close CB21 breaker, then ES21/ES22 grounding disconnectors. Disconnect ES21’s SF6 - shell ground.

  • Wiring: Connect battery between ES21’s moving contact (negative grounded) + ground electrode. This lets current flow L1→L2 in TA’s primary coil. Wire K1 (CT secondary) to DC milliammeter +ve, K2 to - ve.

  • Test: Use DC method—apply DC to primary, check milliammeter deflection. Use ≤100mA range (100μA best for clear deflection). Briefly connect/disconnect ES21’s moving contact + K - battery +ve. Positive deflection (battery on) + negative (battery off) means L1 (CT) and K1 (secondary) are same polarity. Note CT primary coil positions; draw results.

1.2 Old Method

  • Pre - test ops: Close FDS21/FDS22 disconnector, matching disconnector. Open ES21/ES22 grounding disconnectors. Close CB21 breaker.

  • Wiring: Connect battery +ve to 110kV inlet bushing (Ⅰ/Ⅱ), - ve to GIS outlet bushing. Briefly connect/disconnect. Positive deflection (on) + negative (off) means L1/K1 are same polarity. Note CT positions; draw results.

2 Method Comparison

  • New: Simple wiring/ops, low energy loss, works with small batteries. Milliammeter deflects sharply—high sensitivity, accurate.

  • Old: Complex steps, long wires—troublesome on - site. High - altitude risks (battery wiring on bushings). More series components → high impedance → unstable results. Often needs big batteries (rare on - site), risking wrong calls.

3. Safety Must - Dos

Follow strict sequence: Keep CB21 open → open FDS21/FDS22 (line) + DS23 (bus) → close ES21/ES22 (grounding). Critical for live lines/buses—avoids “live + ground disconnector” accidents.

4. Wrap - Up

The new method solves on - site polarity testing pain points, ensures relay protection works, and stabilizes grids. After 8 years in testing, I swear: choosing the right method balances safety + efficiency. 

Give a tip and encourage the author!
Recommended
How to Test Vacuum in Vacuum Circuit Breakers
How to Test Vacuum in Vacuum Circuit Breakers
Vacuum Integrity Testing of Circuit Breakers: A Critical Measure for Performance EvaluationVacuum integrity testing is a key method for assessing the vacuum performance of circuit breakers. This test effectively evaluates the insulation and arc-quenching capabilities of the breaker.Before testing, ensure the circuit breaker is properly installed and correctly connected. Common vacuum measurement methods include the high-frequency method and the magnetic control discharge method. The high-frequen
Oliver Watts
10/16/2025
Ensure Hybrid System Reliability with Full Production Testing
Ensure Hybrid System Reliability with Full Production Testing
Production Testing Procedures and Methods for Wind-Solar Hybrid SystemsTo ensure the reliability and quality of wind-solar hybrid systems, several critical tests must be conducted during production. Wind turbine testing primarily includes output characteristic testing, electrical safety testing, and environmental adaptability testing. Output characteristic testing requires measuring voltage, current, and power under varying wind speeds, plotting wind-power curves, and calculating power generatio
Oliver Watts
10/15/2025
Electrical Meter Accuracy Issues? Solutions Revealed
Electrical Meter Accuracy Issues? Solutions Revealed
Analysis of Measurement Errors in Electrical Instruments and Elimination Strategies1.Electrical Instruments and Common Testing MethodsElectrical instruments play a vital role in the generation, transmission, and utilization of electricity. As a special form of energy, electricity requires strict safety standards in production and use. Safe electricity usage is crucial to daily life, production, and socio-economic development. Power system monitoring relies on electrical instruments, which are of
Oliver Watts
10/07/2025
High-Voltage Electrical Testing: Key Safety Requirements for Field Operations
High-Voltage Electrical Testing: Key Safety Requirements for Field Operations
The test site layout must be reasonable and organized. High-voltage testing equipment should be placed close to the test object, live parts must be isolated from each other, and remain within the clear line of sight of test personnel. Operational procedures must be rigorous and systematic. Unless otherwise specified, voltage must not be suddenly applied or removed during operation. In case of abnormal conditions, voltage increase must be stopped immediately, pressure rapidly reduced, power disc