Scott-T Transformer Connection

Edwiin
Edwiin
Field: Power switch
China

Definition: The Scott-T Connection is a technique for linking two single-phase transformers to enable 3-phase to 2-phase conversion and vice versa. The two transformers are electrically connected but operate independently magnetically. One transformer is designated as the main transformer, while the other is termed the auxiliary or teaser transformer.

The diagram below illustrates the Scott-T transformer connection:

  • The main transformer features a center tap at point D and is connected to lines B and C on the 3-phase side. Its primary winding is labeled BC, and its secondary winding is labeled a₁a₂.

  • The teaser transformer is connected between line terminal A and the center tap D. Its primary winding is labeled AD, and its secondary winding is labeled b₁b₂.

For the Scott-T connection, identical and interchangeable transformers are employed, each featuring a primary winding with Tp turns and equipped with tappings at 0.289Tp, 0.5Tp, and 0.866Tp.

Phasor Diagram of Scott Connection Transformer

The line voltages of the balanced 3-phase system—VAB, VBC, and VCA—are depicted in the figure below, illustrated as a closed equilateral triangle. The diagram also shows the primary windings of the main transformer and the teaser transformer.

Point D splits the primary winding BC of the main transformer into two equal halves. Consequently, the number of turns in the BD portion equals the number of turns in the DC portion, both being Tp/2. The voltages VBD and VDC are equal in magnitude and in phase with the voltage VBC.

The voltage between A and D is

The teaser transformer has a primary voltage rating of √3/2 (i.e., 0.866) times that of the main transformer. When the voltage VAD is applied to the teaser transformer's primary winding, its secondary voltage V2t leads the main transformer's secondary terminal voltage V2m by 90 degrees, as depicted in the figure below.

To maintain the same voltage per turn in the primary windings of both the main transformer and the teaser transformer, the number of turns in the teaser transformer's primary must be be √3/2 Tp.

Consequently, the secondaries of both transformers have identical voltage ratings. The secondary voltages V2t and V2m are equal in magnitude but separated by 90º in phase, thereby producing a balanced 2-phase system.

Position of Neutral Point N

The primary windings of the two transformers can form a four-wire connection to a 3-phase supply if a tap N is provided on the teaser transformer's primary such that:

  • The voltage across AN, denoted as VAN), equals the phase voltage, i.e.,VAN= Vt/√3.

The same voltage turn in portion AN, ND and AD are shown by the equations,

The equation above indicates that the neutral point N divides the primary winding of the teaser transformer in the ratio:AN:ND = 2 : 1

Applications of Scott-T Connection

The Scott-T connection finds practical use in the following scenarios:

  • Electric Furnace Installations: It enables the parallel operation of two single-phase furnaces while drawing a balanced load from a three-phase supply, ensuring efficient power distribution and system stability.

  • Single-Phase Load Management: Commonly applied in electrified rail systems (e.g., electric trains), where single-phase loads are scheduled to maintain near-equal loading across all three phases of the supply, minimizing imbalance and optimizing grid performance.

  • Phase Conversion Between Systems: Facilitates bidirectional power flow between three-phase and two-phase systems. While it can convert both ways, practical applications predominantly focus on three-phase to two-phase conversion, as two-phase generators are rarely used in modern power systems.

Give a tip and encourage the author!
Recommended
How to Identify Internal Faults in a Transformer?
How to Identify Internal Faults in a Transformer?
Measure DC resistance: Use a bridge to measure the DC resistance of each high- and low-voltage winding. Check whether the resistance values among phases are balanced and consistent with the manufacturer’s original data. If phase resistance cannot be measured directly, line resistance may be measured instead. The DC resistance values can indicate whether the windings are intact, whether there are short circuits or open circuits, and whether the contact resistance of the tap changer is normal. If
Felix Spark
11/04/2025
What are the requirements for inspecting and maintaining a transformer's no-load tap changer?
What are the requirements for inspecting and maintaining a transformer's no-load tap changer?
The tap changer operating handle shall be equipped with a protective cover. The flange at the handle shall be well sealed with no oil leakage. Locking screws shall securely fasten both the handle and the drive mechanism, and the handle rotation shall be smooth without binding. The position indicator on the handle shall be clear, accurate, and consistent with the tap voltage regulation range of the winding. Limit stops shall be provided at both extreme positions. The insulating cylinder of the t
Leon
11/04/2025
How to Overhaul a Transformer Conservator (Oil Pillow)?
How to Overhaul a Transformer Conservator (Oil Pillow)?
Overhaul Items for Transformer Conservator:1. Ordinary-Type Conservator Remove the end covers on both sides of the conservator, clean rust and oil deposits from inner and outer surfaces, then apply insulating varnish to the inner wall and paint to the outer wall; Clean components such as the dirt collector, oil level gauge, and oil plug; Check that the connecting pipe between the explosion-proof device and the conservator is unobstructed; Replace all sealing gaskets to ensure good sealing with n
Felix Spark
11/04/2025
Why is it difficult to increase the voltage level?
Why is it difficult to increase the voltage level?
The solid-state transformer (SST), also known as a power electronic transformer (PET), uses voltage level as a key indicator of its technological maturity and application scenarios. Currently, SSTs have reached voltage levels of 10 kV and 35 kV on the medium-voltage distribution side, while on the high-voltage transmission side, they remain in the stage of laboratory research and prototype validation. The table below clearly illustrates the current status of voltage levels across different appli
Echo
11/03/2025
Related Products
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.