• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


12kV 15kV 17.5kV 24kV SF₆ gas-free ring main unit/switchboard panel Original Manufacturer

  • 12kV 15kV 17.5kV 24kV SF₆ gas-free ring main unit/switchboard panel Original Manufacturer

Key attributes

Brand ABB
Model NO. 12kV 15kV 17.5kV 24kV SF₆ gas-free ring main unit/switchboard panel Original Manufacturer
Rated voltage 24kV
Rated frequency 50/60Hz
Series PrimeGear ZX2

Product descriptions from the supplier

Description

Customer benefits:

Compliant with IEC standards and F-gas regulation

  •  Compliant with IEC standards and with the EU F-gas regulation (EU) 2024/573.

  •  High ratings up to 2500A. Single busbar modular and compact lowpressure design, based on natural origin gases (SF6 free).

  •  Loss of service continuity LSC 2A  and partition class PM*.

Reliable and flexible 

  • Compact and modular design for space optimization. 

  • Very low maintenance required as all high voltage parts are permanently sealed in a gas tank and protected from soiling, humidity, foreign bodies, and other environmental influences.

  • Due to the low-pressure design,  the switchgear can remain in service  up to the point of repair, even in the unlikely event of a leak. 

  • The switchgear can be enabled with monitoring and diagnostics (e.g., temperature, gas, partial discharge)  to track asset health. Automation and control features based on current and voltage sensors and IEC 61850 protocol allow for customization during the manufacturing phase and varying loads during operations.

  • Well known and proven vacuum circuit breaker type VD4X. 

  • Outer cone cable termination system.

Safety 

  •  High level of operator safety with front, lateral and rear arc protection,  certified AFL(R) 40kA 1s (according to IEC 62271-200). 

  • Plug-in busbar technology and the factory-assembled pressure relief duct allows for safe, quick and easy installation at site. 

  • With the switchgear diagram and operation controls on the front panel, no opening of the doors  is required for manual operation making the switchgear operator friendly.

  •  Wide range of monitoring and diagnostic features for safe and reliable operations. All switching devices are motor-operated and  can be controlled remotely.

  •  Mechanical and electrical interlocks prevent incorrect operation of the switchgear panels.

Technical parameters:

The voltage classes of some of these eco-friendly switchgears include 6kV, 6.3kV, 6.6kV, 6.9kV, 7.2kV, 10kV, 10.5kV, 11kV, 11.5kV, 12kV, 13.2kV, 13.8kV, 14.5kV, 14.4kV, 15kV, 15.5kV, 15.6kV, 17.5kV, 20kV, 21.9kV, 22kV, 24kV, 30kV, 33kV, 33.5kV, 34.5kV, 35kV, 36kV, 38kV, 38.5kV, 40.5kV, 44kV, 45kV, 46kV, 66kV and 69kV. and customization is available.

Structure diagram:

 

 

Documentation Resource Library
Public.
SF6-free gas-insulated switchgear for primary distribution
Catalogue
English
FAQ
Q: What’s the difference in the circuit breaker for air-insulated vs gas-insulated?
A: Air-insulated switchgear circuit breaker is typically removable or withdrawable. The circuit breaker is based on vacuum circuit technology. In the gas-insulated, it is fixed mounted. The function of withdraw is provided by a separate disconnecting switch. Typically, a three-position switch with connected, disconnected, and ready-to-earth position.
Q: What’s the difference in the circuit breaker for air-insulated vs gas-insulated?
A: Air-insulated switchgear circuit breaker is typically removable or withdrawable. The circuit breaker is based on vacuum circuit technology. In the gas-insulated, it is fixed mounted. The function of withdraw is provided by a separate disconnecting switch. Typically, a three-position switch with connected, disconnected, and ready-to-earth position.
Q: What are the maintenance requirements associated with the air-insulated switchgear (AIS) vs gas-insulated (GIS)?
A: Gas-insulated switchgear requires very low maintenance as all high voltage parts are permanently protected in a gas tank from soiling, humidity, entry of foreign bodies and other environmental influences. Primary, the drives located outside gas compartment require inspection and maintenance. On the other hand, gas-insulated switchgear repair requires additional training (e.g. for gas works) and the replacement or parts may not be as easily. In the air-insulated switchgear visual inspection is recommended in regular intervals, maintenance of power parts is given in installation, operation and maintenance manual (1VLM000363).
Q: What smart solutions are available for ABB’s AIS portfolio?
A: ABB’s switchgear smart solutions are designed to help our customers make data-driven decisions. Our customers can benefit from a wide range monitoring, diagnostic, automation and control features for their ABB’s air-insulated medium voltage switchgear. Contact our sales team to learn more about ABB’s smart solutions for each of our switchgear.
Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 20000m² Total staff: Highest Annual Export(usD): 580000000
Workplace: 20000m²
Total staff:
Highest Annual Export(usD): 580000000
Services
Business Type: Sales
Main Categories: High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • HECI GCB for Generators – Fast SF6 Circuit Breaker
    1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
    01/06/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
  • Design Principles for Pole-Mounted Distribution Transformers
    Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
    12/25/2025
  • Transformer Noise Control Solutions for Different Installations
    1.Noise Mitigation for Ground-Level Independent Transformer RoomsMitigation Strategy:First, conduct a power-off inspection and maintenance of the transformer, including replacing aged insulating oil, checking and tightening all fasteners, and cleaning dust from the unit.Second, reinforce the transformer foundation or install vibration isolation devices—such as rubber pads or spring isolators—selected based on the severity of vibration.Finally, strengthen sound insulation at weak points of the ro
    12/25/2025
  • Risk Identification and Control Measures for Distribution Transformer Replacement Work
    1.Electric Shock Risk Prevention and ControlAccording to typical design standards for distribution network upgrades, the distance between the transformer’s drop-out fuse and the high-voltage terminal is 1.5 meters. If a crane is used for replacement, it is often impossible to maintain the required minimum safety clearance of 2 meters between the crane boom, lifting gear, slings, wire ropes, and the 10 kV live parts, posing a severe risk of electric shock.Control Measures:Measure 1:De-energize th
    12/25/2025

Related Solutions

  • Electrical House (eHouse) Solutions
    Reduce site complexity, improve lead timeABB eHouses are prefabricated transportable substations, designed to house medium voltage and low voltage switchgear, critical power equipment and automation cabinets.An eHouse solution is a cost effective, risk reduced alternative to conventional concrete block and brick construction. Each eHouse module is custom engineered to meet application requirements with respect to equipment layout, site footprint limitations and logistics considerations.Installat
    04/16/2025
  • Improve speed to deployment Modular prefabricated and pre-engineered solutions
    Reduce site works and risk of schedule delays and cost overrunsOverview:With a complicated data center project that has short delivery timelines, prefabricated modular solutions and pre-engineered modular solutions may be the answer.Modular solutions are ideal for enterprise, colocation, edge and cloud data centers, where project replicability and expandability are critical, alongside fast deployment time.Reduce risk by leveraging prefabricated and integrated solutions:Fast track projects with p
    04/16/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.