• JDZ18-12R Voltage Transformer (with fuse)
JDZ18-12R Voltage Transformer (with fuse)
discuss personally
Model
JDZ18-12R-11kV
Basic info
Brand Wone Store
Model NO. JDZ18-12R Voltage Transformer (with fuse)
Rated frequency 50/60Hz
Primary voltage 11kV
Secondary voltage 110V
Series JDZ
Product Detail

Product Overview

JDZ18-12R voltage transformer, epoxy resin casting and full enclosed construction, is used indoor for measuring current, electric energy and protective relaying in single-phase or three-phase AC circuit with the frequency 50Hz or 60Hz and highest voltage for equipment 12kV.

The product has the feature of high reliability, low magnetism of core, large creep distance of external insulation and maintenance free etc.

Key Features

  • Precise Voltage Transformation & Measurement:Specifically designed for 12kV power systems, the JDZ18-12R accurately converts high voltage into low voltage suitable for measurement and protection devices. With minimal voltage ratio error, it meets high-precision metering requirements, providing accurate voltage signals for energy metering devices to ensure precise electricity billing. It also delivers reliable data to relay protection systems, enabling timely detection and response to system anomalies to safeguard grid stability.
  • Built-in Fuse for Overvoltage Protection:This transformer innovatively integrates a fuse to quickly cut off the circuit during voltage surges. When the system encounters lightning strikes or switching overvoltages exceeding safety thresholds, the fuse activates within milliseconds to prevent damage to the transformer and downstream equipment, avoiding severe accidents such as equipment failures and fires, thereby enhancing power system safety and reliability.
  • Epoxy Resin Cast Fully Enclosed Insulation:Utilizing advanced epoxy resin casting technology, it forms a fully enclosed structure with excellent electrical insulation properties capable of withstanding high-voltage impulses. This design effectively resists dust, moisture, salt fog, and other environmental factors, ensuring stable operation in humid coastal areas or dusty industrial environments, reducing maintenance frequency and extending service life.
  • Compliance with International & Industry Standards:Manufactured strictly in accordance with 权威 standards such as IEC 6044 and GB 1207-2006 "Voltage Transformers," it has passed rigorous quality inspections and performance tests including withstand voltage and partial discharge tests. Its quality and performance are fully guaranteed, making it suitable for a wide range of power engineering projects complying with relevant standards.

Main technical parameter

  • Highest voltage for equipment: 12kV
  • Rated primary voltage: 11kV
  • Rated secondary voltage: 100/220V or 110/220V or 100V or 110V.
  • Technical standard accords with IEC 60044-2:2003 Part2 Instrument transformers-Part2: inductive voltage transformers

Remarks: Upon request we are glad to offer transformers according to other standards or with non-standard technical specs.

 

Know your supplier
Wone Store
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment/Instrument Transformer/Equipment Parts
Business Type
Sales
Highest Annual Export (USD)
$300000000
Professional Experience
1 years
Workplace
1000m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!