Ⅰ. Project Background & Pain Point Analysis
The Mexican office building utilizes a 15HP commercial central air conditioning system originally powered by a single-phase 220V grid. Due to the lack of 380V three-phase driving voltage, the compressor startup current exceeds overload limits (measured at 3.2× rated current), causing refrigeration efficiency to plummet to 40%, accompanied by:
Ⅱ. ROCKWELL American Standard Distribution Transformer Solution Design
1. Core Equipment Selection
American Standard Distribution Transformer supporting 220V to 380V conversion
2. Intelligent Monitoring System Integration
(1) Remote monitoring module
(2) Predictive protection
(3) Energy Efficiency Optimization
Ⅲ. Implementation Results Verification
Metric | Pre-retrofit | Post-retrofit | Improvement |
Startup current | 320A | 98A | 69% reduction |
Refrigeration efficiency | 40% | 98% | 145% increase |
Monthly failures | 3 | 0 | 100% elimination |
Annual power consumption | 580,000kWh | 476,000kWh |
18% reduction |
Temperature control accuracy | ±2.5℃ | ±0.5℃ | 5 × improvement |
Ⅳ. Localized Service Assurance