What Conflicts Exist Between FA and UFLS in Power Systems and How to Solve Them?

RW Energy
Field: Distribution Automation
China

Feeder Automation (FA) and Under-Frequency Load Shedding (UFLS) are two critical protection and control mechanisms in power systems. While both aim to ensure safe and stable system operation, they carry potential conflicts in logic and timing that require careful coordination.

Feeder Automation (FA): Primarily addresses local feeder faults (e.g., short circuits, ground faults) in distribution networks. Its objective is to quickly locate and isolate faulted sections and restore power to non-faulted areas via network reconfiguration using switches. FA emphasizes rapid local power restoration.

Under-Frequency Load Shedding (UFLS): Responds to severe frequency drops in the interconnected grid (e.g., due to generator tripping, sudden load increase, or tie-line disconnection causing power deficit). It systematically sheds pre-designated non-critical loads to prevent frequency collapse, restore power balance, and stabilize system frequency. UFLS prioritizes overall system frequency security.

Under-Voltage Load Shedding (UVLS): Monitors system voltage in real time. When voltage drops below a preset threshold, the UVLS scheme determines whether to act based on predefined logic. If conditions are met, it sequentially sheds loads to reduce reactive power demand or enhance reactive support, thereby restoring voltage to normal levels.

Conflict Case Examples

  • Case 1: In 2019, in North America, FA-induced power restoration triggered a secondary frequency collapse.

  • Case 2: In 2020, in East China, FA operation following a short-circuit fault caused erroneous UFLS activation.

  • Case 3: In 2021, wind farm disconnection triggered overlapping actions between UFLS and FA.

  • Case 4: In 2022, during a typhoon in South China, FA network reconfiguration led to excessive load shedding.

Event Description

In 2022, 110kV Line A and a power plant’s grid-connected Line B were operating on Bus Section I of a 110kV substation. A fault on Line A caused Switch A to trip. However, since the plant’s Line B switch remained closed, power continued to be supplied to the substation. As a result, the voltage on Bus Section I did not fall below the undervoltage threshold, preventing the 110kV automatic transfer switch (ATS) from initiating. Similarly, the plant supplied power via Transformer No. 1 to the 10kV Buses I and IV, whose voltages also remained above threshold, so the 10kV ATS did not activate.

As the plant continued to supply load, system frequency gradually declined. 5.3 seconds after Switch A tripped, frequency dropped to 48.2 Hz. The plant’s under-voltage and under-frequency separation device, set at 47 Hz and 0.5 s, did not operate. However, the substation’s UFLS relay, set at 48.25 Hz and 0.3 s, detected the frequency of 48.12 Hz and operated correctly, shedding several 10kV feeders (Lines C, D, E, F, G). All secondary equipment operated as expected.

On-site Review

The 110kV substation’s Switch A tripped correctly due to protection action, and UFLS operated, disconnecting Lines C, D, E, F, and G. The substation switches issued trip signals, triggering FA activation. The fault was identified between the substation switch and the first line switch. FA initiated on all five lines, locating the fault between the substation outlet and the first switch. However, no fault was found during on-site inspection, confirming a false FA operation.

Solution

  • Enhance synchronization of load shedding information. For lines with UFLS/UVLS protection, support blocking of automatic load transfer functions.

  • Implement robust load transfer blocking: in fully automatic centralized FA schemes, upon receiving a load shedding signal, immediately block the FA execution function for the affected lines.

Give a tip and encourage the author!
Recommended
Why Regular Transformer Maintenance Matters: 5 Serious Consequences of Neglecting It
I. Allowable TemperatureWhen a transformer is in operation, its windings and iron core generate copper loss and iron loss. These losses are converted into heat energy, causing the temperature of the transformer's iron core and windings to rise. If the temperature exceeds the allowable value for a long time, the insulation will gradually lose its mechanical elasticity and age.The temperature of each part of the transformer during operation is different: the winding temperature is the highest, fol
Rockwell
09/12/2025
How to Implement Condition-Based Maintenance for Power Transformers? A Complete 4-Step Process Analysis
1. Definition of Condition-Based MaintenanceCondition-based maintenance refers to a maintenance method where decisions on whether and how to perform maintenance are determined based on the real-time operating status and health condition of equipment. It has no fixed maintenance methods or schedules. The prerequisite for condition-based maintenance is the establishment of equipment parameters and the comprehensive analysis of various operational information of the equipment, so as to make reasona
Noah
09/12/2025
Can't choose a dry-type transformer? Get expert advice – free.
Traction Rectifier TransformersRated capacity: 800 to 4400 kVA; Voltage class: 10 kV and 35 kV; Rectifier pulse number: 12-pulse and 24-pulse. Compared with 12-pulse rectifier circuits, 24-pulse rectifier circuits can reduce the harmonic pollution of the power grid by 50%, and no filtering equipment is needed at this location. It is suitable for power supply systems of urban subways and rail transit.Excitation Rectifier TransformersRated capacity: 315 to 3000 × 3 kVA; Voltage class: 10 kV, 13.8
Vziman
09/12/2025
SG10 Series Transformer Overload Protection Solution | Prevent Overheating and Damage, View Now
Operating Conditions in National Standard GB 6450-1986Ambient temperature: Maximum ambient temperature: +40°C Daily average maximum temperature: +30°C Annual average maximum temperature: +20°C Minimum temperature: -30°C (outdoor); -5°C (indoor) Horizontal axis: Product load; Vertical axis: Average coil temperature rise in Kelvin (note: not in Celsius).For Class H insulation products, the long-term temperature resistance of insulation materials is stipulated by the state as 180°C. However, the in
Rockwell
09/12/2025
Seed Inquiry
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.