What is the name of the insulating material used on a transformer's primary winding?

Encyclopedia
10/10/2024

The insulation materials commonly used in transformer primary winding are as follows:

Enamel wire insulating paint

Enamelled wire is made by coating conductors such as copper wire with a layer of insulating paint. This insulating paint usually has good electrical insulation properties, heat resistance and chemical corrosion resistance. It can effectively isolate the conductor of the primary winding from other parts, preventing short circuit and leakage. For example, polyurethane wire insulating paint, with good wear resistance and solvent resistance, is suitable for transformer windings in various working environments.

Insulating paper

Usually used are cable paper, wrinkle paper and so on. Insulating paper has high mechanical strength and electrical insulation properties, and can be used for interlayer insulation and ground insulation of windings. For example, in transformer windings, cable paper is often used to wrap conductors to increase insulation strength and prevent partial discharge. Corrugated paper, because of its good flexibility and compressibility, is often used to fill the gap between the windings and play a fixed and insulating role.

Insulating film

Such as polyester film, polyimide film and so on. These films have extremely thin thickness and excellent insulation properties, and can be used for interturn insulation of winding. Polyester film has good temperature resistance and mechanical properties, and is widely used in transformers of lower voltage levels. Polyimide film has higher heat resistance and electrical strength, suitable for high temperature, high voltage transformer environment.

Insulating paint

In addition to the enamelled wire, the entire winding of the transformer may also be impregnated with insulating paint after winding. This insulating paint can penetrate into all parts of the winding, enhance the insulation performance, and also play a fixed winding, moisture-proof, mildew proof and other functions. For example, epoxy resin insulating paint has good adhesion and corrosion resistance, and can provide reliable insulation protection for transformer windings.



Encyclopedia

The Electricity Encyclopedia is dedicated to accelerating the dissemination and application of electricity knowledge and adding impetus to the development and innovation of the electricity industry.

Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
Inquiry
Download