Transformer Winding Resistance Testing

Encyclopedia
08/09/2024

Winding Resistance Test Definition

The winding resistance test of a transformer checks the health of transformer windings and connections by measuring resistance.

Purpose of Winding Resistance Test

This test helps in calculating I2R losses, winding temperature, and identifying potential damage or abnormalities.

Measurement Methods

For star connected winding, the resistance shall be measured between the line and neutral terminal.

For star connected autotransformers the resistance of the HV side is measured between HV terminal and HV terminal, then between HV terminal and the neutral.

For delta connected windings, measurement of winding resistance shall be done between pairs of line terminals. As in delta connection the resistance of individual winding can not be measured separately, the resistance per winding shall be calculated as per the following formula:

Resistance per winding = 1.5 × Measured value

The resistance is measured at ambient temperature and converted to resistance at 75°C for comparison with design values, past results, and diagnostics.

Winding Resistance at standard temperature of 75°C

e7a264aa3eeaacc1f05f19efbf7fb090.jpeg

Rt = Winding resistance at temperature t

t = Winding temperature

Bridge Method of Measurement of Winding Resistance

The main principle of the bridge method is based on comparing an unknown resistance with a known resistance. When currents flowing through the arms of the bridge circuit become balanced, the reading of galvanometer shows zero deflection that means at balanced condition no current will flow through the galvanometer.

A very small value of resistance (in milli-ohms range) can be accurately measured by the Kelvin bridge method whereas for higher value Wheatstone bridge method of resistance measurement is applied. In bridge method of measurement of winding resistance, the errors are minimized.

 

The resistance measured by Kelvin bridge,

 


 

b9d594a35acc4cc0ac62953f2708fd9a.jpeg


 

The resistance measured by Wheatstone bridge, 

a42c3e57992210361431377f0d58c28d.jpeg

Key Considerations and Precautions

Test current should not exceed 15% of the winding’s rated current to avoid heating and changing resistance values.

Encyclopedia

The Electricity Encyclopedia is dedicated to accelerating the dissemination and application of electricity knowledge and adding impetus to the development and innovation of the electricity industry.

Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025