To de-energize a GIS, shall the isolator switch be opened first followed by the opening of the circuit breaker?

Encyclopedia
Field: Encyclopedia
0
China

The sequence of operations in disconnecting Gas Insulated Switchgear (GIS) is critical to ensure safety and prevent damage to the equipment. Generally, the correct order when disconnecting the power supply in a GIS involves first opening the circuit breaker and then operating the disconnector (also known as an isolator). Here is a detailed explanation:

Correct Operational Sequence

  1. Open the Circuit Breaker

    • The circuit breaker is the primary device used to interrupt the load current. Before disconnecting the power supply, the circuit breaker must be opened first to ensure that the current stops flowing completely.

    • The circuit breaker is designed to interrupt the circuit under load conditions without producing an arc, thereby protecting personnel and equipment.

  2. Open the Disconnector

    • After the circuit breaker has interrupted the current, the disconnector should be operated. Disconnectors generally do not have arc-quenching capabilities and should only be operated when there is no current flowing.

    • The purpose of the disconnector is to provide a visible break point during maintenance or inspection to ensure that downstream equipment cannot be energized unexpectedly.

Importance of the Sequence

  • Safety Considerations: Opening the disconnector before the circuit breaker could result in an arc forming at the disconnection point, causing damage to the equipment or posing a danger to the operator.

  • Equipment Protection: The circuit breaker is designed to interrupt the current under load conditions, whereas the disconnector lacks this capability. Therefore, opening the circuit breaker first protects the disconnector from damage.

Operational Guidelines

When operating GIS equipment, always follow the manufacturer's instructions provided in the operational manual and adhere to relevant electrical safety procedures. Additionally, operators should receive proper training and wear appropriate Personal Protective Equipment (PPE) to ensure personal safety during operations.

Other Considerations

  • Earthing Switch: In certain situations, it may be necessary to operate the earthing switch to ensure that the circuit is grounded and prevent the presence of residual charge.

  • Testing: Before and after operating the disconnector, voltage detectors should be used to test for the presence of voltage to ensure safety.

  • Coordinated Operations: If multiple circuit breakers or disconnectors are involved, operations should be coordinated according to a specific sequence to prevent accidental misoperation.

In summary, the correct sequence is to open the circuit breaker first, followed by the disconnector. This ensures operational safety and protects the GIS equipment from damage.

If you have any further questions or need more information, please let me know!


Give a tip and encourage the author!

Recommended

Classification of Equipment Defects for Relay Protection and Safety Automatic Devices in Substations
In daily operations, various equipment defects are inevitably encountered. Whether maintenance personnel, operation and maintenance staff, or specialized management personnel, all must understand the defect classification system and adopt appropriate measures according to different situations.According to Q/GDW 11024-2013 "Operation and Management Guide for Relay Protection and Safety Automatic Devices in Smart Substations," equipment defects are classified into three levels based on severity an
12/15/2025
Under What Conditions Will the Line Circuit Breaker Auto-Reclosing Signal Be Locked Out?
The line circuit breaker auto-reclosing signal will be locked out if any of the following conditions occur:(1) Low SF6 gas pressure in circuit breaker chamber at 0.5MPa(2) Insufficient energy storage in circuit breaker operating mechanism or low oil pressure at 30MPa(3) Busbar protection operation(4) Circuit breaker failure protection operation(5) Line distance protection zone II or zone III operation(6) Short lead protection operation of circuit breaker(7) Presence of remote tripping signal(8)
12/15/2025
Application of Auto-Reclosing Residual Current Protective Devices in Lightning Protection for Communication Power Supplies
1. Power Interruption Problems Caused by RCD False Tripping During Lightning StrikesA typical communication power supply circuit is shown in Figure 1. A residual current device (RCD) is installed at the power supply input terminal. The RCD primarily provides protection against electrical equipment leakage currents to ensure personal safety, while surge protective devices (SPDs) are installed on power supply branches to protect against lightning intrusions. When lightning strikes occur, the senso
12/15/2025
Reclosing Charge Time: Why Does Reclosing Require Charging? What Effects Does Charging Time Have?
1. Function and Significance of Reclosing ChargingReclosing is a protective measure in power systems. After faults such as short circuits or circuit overloads occur, the system isolates the faulty circuit and then restores normal operation through reclosing. The function of reclosing is to ensure continuous operation of the power system, improving its reliability and safety.Before performing reclosing, the circuit breaker must be charged. For high-voltage circuit breakers, the charging time is g
12/15/2025
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.