Analysis of Earth Fault Protection in Low-Voltage Distribution Systems for Data Centers

Leon
Field: Fault Diagnosis
China

Low-voltage power distribution lines are widely used across various industries, and the distribution environments are complex and diverse. These lines are accessed not only by professionals but also frequently by non-specialists, significantly increasing the risk of faults. Improper design or installation can easily lead to electric shock (particularly indirect contact), damage to wiring, or even electrical fires.

The grounding system is a critical component of low-voltage distribution networks—a technically complex and safety-critical engineering element. The type of grounding system is closely linked to the effectiveness of grounding fault protection.

Currently, the low-voltage distribution systems in data centers across China primarily adopt the TN-S grounding configuration. These systems involve numerous low-voltage distribution devices and extensive cabling, representing substantial capital investment. Any fault, if not promptly addressed, could result in severe personnel injuries and significant property damage, hence demanding extremely high reliability from the distribution system.

To provide a more comprehensive and systematic explanation of grounding fault protection in low-voltage distribution systems, the following section presents a comparative analysis of various grounding configurations and their corresponding fault protection methods.

General Requirements for Earth Fault Protection

  • The earth fault protection system shall be designed to effectively prevent indirect electric shock to personnel, as well as accidents such as electrical fires and damage to wiring.
  • Exposed conductive parts of electrical equipment shall be reliably connected to the protective conductor (PE conductor) in accordance with the specific conditions of the system. Externally accessible conductive parts that may be simultaneously touched shall be connected to the same grounding system to ensure potential equalization.
  • Where the earth fault protection of an electrical installation cannot meet the requirement for automatic disconnection of the fault circuit within the specified time, supplementary equipotential bonding shall be implemented within the local area to reduce touch voltage and enhance safety.

Earth Fault Protection in TN Systems

In TN systems, the operating characteristics of earth fault protection for distribution circuits shall satisfy the following condition:

Zs × Ia ≤ Uo

Where:

  • Zs — Total impedance of the earth fault loop (Ω);
  • Ia — Current required to cause the protective device to automatically disconnect the fault circuit within the specified time (A);
  • Uo — Nominal voltage between phase and earth (V).

As illustrated in the figure below, when a ground fault occurs on phase L3, the fault current (Id) flows through the L3 phase conductor, the metallic enclosure of the equipment, and the PE protective conductor, forming a closed loop. Zs represents the total impedance of the phase-to-protective conductor loop, and Uo is 220V.

Disconnection Time Requirements for Earth Fault Protection in TN Systems

For TN system distribution circuits with a nominal phase-to-earth voltage of 220V, the time required for earth fault protection to disconnect the fault circuit shall comply with the following requirements:

  • For distribution circuits or final circuits supplying fixed electrical equipment, the disconnection time should not exceed 5 seconds;
  • For circuits supplying hand-held or mobile equipment, or socket-outlet circuits, the disconnection time shall not exceed 0.4 seconds.

Selection of Earth Fault Protection Methods in TN Systems:

a. When the above disconnection time requirements can be met, overcurrent protection may be used to also serve as earth fault protection;
b. When overcurrent protection cannot meet the requirements, but zero-sequence current protection can, zero-sequence current protection shall be used. The protection setting value should be greater than the maximum unbalanced current under normal operating conditions;
c. When neither of the above methods can satisfy the requirements, residual current operated protection (RCD, or "leakage current protection") shall be employed.

Earth Fault Protection in TT Systems

The operating characteristic of earth fault protection in TT system distribution circuits shall satisfy the following condition:

RA × Ia ≤ 50 V

Where:

  • RA — The sum of the earth electrode resistance of exposed conductive parts and the neutral (N) conductor earth resistance (Ω);
  • Ia — The current required to ensure the protective device reliably disconnects the fault circuit (A).

As shown in the figure below, when a ground fault occurs on phase L3, the fault current (Id) flows through the L3 conductor, the metallic enclosure of the equipment, the equipment's grounding electrode resistance, the earth, and back to the source via the neutral point grounding resistance, forming the fault loop. The value of 50 V represents the safety limit for touch voltage, ensuring that the voltage to which a person may be exposed during a fault does not pose a danger.

Selection of Earth Fault Protection for TT Systems:

  • When overcurrent protective devices are used, the current Ia shall be the value that ensures disconnection of the fault circuit within 5 seconds;
  • When instantaneous-trip overcurrent protective devices are used, Ia shall be the minimum current required to ensure instantaneous operation;
  • When residual current operated protective devices (RCDs, or "leakage current protection") are used, Ia shall be taken as their rated residual operating current In.

Earth Fault Protection in IT Systems

Under normal operation, the leakage current in each phase of an IT system consists of capacitive current to earth—denoted as Iac, Ibc, Ica—and the vector sum of these three-phase earth capacitance currents is zero. Therefore, the neutral point voltage can be considered as 0V.

When the first earth fault occurs, the voltage-to-earth on the healthy (non-faulted) phases increases by a factor of √3. This indicates that IT systems impose higher insulation level requirements on electrical equipment compared to TN and TT systems. However, since the current during the first earth fault is very small (primarily capacitive current), the system can continue to operate. Nevertheless, an insulation monitoring device must be installed to provide an alarm upon detection of the first fault, enabling operation and maintenance personnel to locate and rectify the fault promptly.

  • When exposed conductive parts are individually earthed, the disconnection of the fault circuit during a second fault on a different phase shall comply with the earth fault protection requirements of the TT system;
  • When exposed conductive parts are connected to a common earthing system, the disconnection of the fault circuit during a second fault on a different phase shall comply with the earth fault protection requirements of the TN system;
  • The IT system should not have a neutral conductor (N line) derived.

In summary, different power supply earthing systems exhibit distinct earth fault characteristics. Only by fully understanding the fault behavior of each system can an appropriate and compatible earth fault protection scheme be designed, ensuring safe and reliable operation of power supply and utilization systems.

Give a tip and encourage the author!
Recommended
Why Regular Transformer Maintenance Matters: 5 Serious Consequences of Neglecting It
I. Allowable TemperatureWhen a transformer is in operation, its windings and iron core generate copper loss and iron loss. These losses are converted into heat energy, causing the temperature of the transformer's iron core and windings to rise. If the temperature exceeds the allowable value for a long time, the insulation will gradually lose its mechanical elasticity and age.The temperature of each part of the transformer during operation is different: the winding temperature is the highest, fol
Rockwell
09/12/2025
How to Implement Condition-Based Maintenance for Power Transformers? A Complete 4-Step Process Analysis
1. Definition of Condition-Based MaintenanceCondition-based maintenance refers to a maintenance method where decisions on whether and how to perform maintenance are determined based on the real-time operating status and health condition of equipment. It has no fixed maintenance methods or schedules. The prerequisite for condition-based maintenance is the establishment of equipment parameters and the comprehensive analysis of various operational information of the equipment, so as to make reasona
Noah
09/12/2025
Can't choose a dry-type transformer? Get expert advice – free.
Traction Rectifier TransformersRated capacity: 800 to 4400 kVA; Voltage class: 10 kV and 35 kV; Rectifier pulse number: 12-pulse and 24-pulse. Compared with 12-pulse rectifier circuits, 24-pulse rectifier circuits can reduce the harmonic pollution of the power grid by 50%, and no filtering equipment is needed at this location. It is suitable for power supply systems of urban subways and rail transit.Excitation Rectifier TransformersRated capacity: 315 to 3000 × 3 kVA; Voltage class: 10 kV, 13.8
Vziman
09/12/2025
High harmonics? Your transformer may be overheating and aging fast.
This report is based on the analysis of one-day power quality monitoring data of your company's distribution system. The data shows that there is significant three-phase current harmonic distortion in the system (with a high total harmonic distortion of current, THDi). In accordance with international standards (IEC/IEEE), harmonic currents at this level have posed substantial risks to the safe, reliable, and economical operation of the power supply transformer, mainly manifested in additional h