Draught is the pressure difference which causes a flow of air or gases from one point to another point in the boiler system. Draught is required in a boiler system mainly due to two reasons.

  1. To supply sufficient air for completing the combustion.

  2. To remove flue gases from the system after combustion and the heat exchange.

There are two types of draught applied to the boiler system.

  1. The natural draught

  2. The forced draught

We will discuss here in this article about natural draught. The natural draught is always preferred since it does not need any running cost although it has a big initial cost. Natural draught allows natural circulation of air through the boiler system. The natural draught mainly depends upon the height of the chimney.

We try to calculate the required height of the chimney for a required natural draught for a boiler system. For that, we have to go through two basic equations of gaseous pressure. The equations are

Where, “P” is the pressure of air or gas, “ρ” is the density of the air or gas, “g” is the gravitational constant, and “h” is the height of the head.

Here “V” is the volume of the air or gas, “m” is the mass of the gas or air, “T” is the temperature measured in kelvin scale and “R” is the gas constant.
Equation (2) can be rewritten as

During combustion process in the furnace, mainly carbon reacts with oxygen (O2) of the air and forms carbon dioxide (CO2). The volume of the solid carbon compared to the required air for the reaction is negligible. Because of that, we can consider that the volume of air required for combustion is exactly equal to the volume of the flue gases created after combustion if we assume temperature before and after combustion are same. But this is not the actual case. The air entries in the combustion chamber will gain extra volume after combustion due to combustion temperature. The gained volume of the air will be equivalent to the volume of the flue gases created after combustion.


Let us assume, ρo is the density of the air at 0oC or 273 K, and say it is To
Here, P is the pressure of air at 0oC or 273 K, that is at To K.
If we keep, the pressure P as constant, the relation between density and temperature of the air or gases can be written as,

Where, ρa and ρg is the density of the air at temperature Ta and Tg K respectively.
natural draught and chimney

From, equation (1) and (5) we can write the expression of pressure at point “a” outside the chimney, as

The volume of the air at the temperature Tg would be

Let us assume, m kg of air is required to burn 1 kg of carbon then the density of the flue gas would be

The pressure of the flue gas inside the cheimny from equation (1) and (8), would be

The pressure difference between outside and inside of the chimney from equation 96) and (9) would be

Here, “h” is the minimum height of the chimney to be constructed for the draught ΔP. The flue gas will flow upwards through the chimney due to this pressure difference. So, by calculating this pressure difference one can easily calculate the approximate height of the chimney to be constructed. The pressure difference can be represented as a formula for calculating the height of the chimney for a natural draught.

Statement: Respect the original, good articles worth sharing, if there is infringement please contact delete.

Give a tip and encourage the author!

Recommended

Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
01/30/2026
Neutral point grounding operation mode for 110kV~220kV power grid transformers
The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
01/29/2026
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
01/29/2026
HECI GCB for Generators – Fast SF6 Circuit Breaker
1.Definition and Function1.1 Role of the Generator Circuit BreakerThe Generator Circuit Breaker (GCB) is a controllable disconnect point located between the generator and the step-up transformer, serving as an interface between the generator and the power grid. Its primary functions include isolating generator-side faults and enabling operational control during generator synchronization and grid connection. The operating principle of a GCB is not significantly different from that of a standard c
01/06/2026
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.