• 33KV Electric Pad Mounted Transformer
33KV Electric Pad Mounted Transformer
discuss personally
Model
ZGS-33
Basic info
Brand ROCKWILL
Model NO. 33KV Electric Pad Mounted Transformer
Rated voltage 33kV
Phases Three-phase
Series ZGS
Product Detail

Product Description
Rockwill’s pad-mounted transformer is a fully enclosed, ground-level solution designed for stepping down high-voltage electricity to usable levels in residential, commercial, and industrial applications. Unlike pole-mounted units, our transformers are housed in tamper-proof, weather-resistant metal enclosures mounted on concrete pads, ensuring safety, durability, and space efficiency.

Key Features:

  • Enhanced Safety – Fully insulated and sealed construction for operator and public protection.

  • Space-Saving Design – Compact and aesthetically suited for urban environments.

  • Flexible Installation – Adaptable to various site conditions without compromising performance.

  • Quiet Operation – Advanced core technology reduces noise levels for minimal disturbance.

Main Characteristics

  • Full Insulation & Sealed Structure – Ensures complete safety for personnel and equipment.

  • Dual Fuse Protection – Features a plug-in Unika fuse (temperature & current-sensitive) and a backup current-limiting fuse for cost-effective operation.

  • Insulated HV Cable Connectors – Safe, reliable, and easy to operate.

  • Compatible with Ring Main & Terminal Systems – Enables flexible power supply configurations for improved reliability.

  • Advanced Core Design – Three-phase three-limb or five-limb construction with step-lap technology for reduced noise, lower losses, and superior short-circuit resistance.

  • Vacuum Drying & Oil-Filling Technology – Ensures high-quality insulation and extends transformer lifespan.

  • Anti-Corrosion Enclosure – Specialized coating with anti-condensation, anti-salt fog, and anti-mildew properties, ideal for harsh environments.

Advantages

  • Compact & Aesthetic – Ideal for urban and high-density areas.

  • Tamper-Proof & Maintenance-Free – Secure design with long-term reliability.

  • Easy Installation & Operation – Ready-to-deploy with minimal site adjustments.

Applications

  • Urban Power Networks – Residential complexes, high-rise buildings.

  • Industrial Zones – Factories, airports, train stations.

  • Public Infrastructure – Schools, hospitals, commercial centers.

Service Environment

  • Temperature Range: -25°C to +40°C

  • Altitude: Up to 1000m

  • Seismic Resistance: ≤3 m/s² (horizontal), ≤1.5 m/s² (vertical)

  • Installation Conditions: Non-explosive, well-ventilated areas free from excessive pollution, vibration, or corrosive agents.

 Basic Info

Know your supplier
ROCKWILL
Rockwill Electric Group Global Manufacturer of High voltage and medium-voltage power equipment and smart grid solutions. Headquartered in Wenzhou, China. Serving 100+ countries with quality, innovation, and trust. What We Offer: • HV-MV switchgear (VCB, SF₆ circuit breakers, RMU, GIS) • Distribution transformers and substations • Smart grid and monitoring systems • Solar, wind, EV charging, and energy storage solutions • EPC turnkey power projects Certified: ISO 9001 / ISO 14001 / ISO 45001
Main Categories
High Voltage Electrical Apparatus
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150,000,000
Professional Experience
16 years
Workplace
108000m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!