• 1100kV UHV SF6 Circuit Breaker
1100kV UHV SF6 Circuit Breaker
discuss personally
Model
LW10B-1100/4000-63
Basic info
Brand Wone
Model NO. 1100KV/4000A SF6 Circuit Breaker
Rated voltage 1100KV
Rated normal current 4000A
Series LW10B
Product Detail

Description:

SF6 circuit-breaker is a double-column four-fracture form, with a shunt capacitor and a closing resistor at interrupter chamber breaks; The circuit-breaker has compact structure, small arc extinguishing chamber, high contact speed, stable and reliable performance, long service life and high comprehensive technical and economic index.

SF6 circuit-breaker is outdoor three-phase AC 50Hz UHV transmission equipment, which is used to control, measure, protect and switch transmission lines in the power system with a rated voltage of 1000 kV. It can also be used to meet the capacitive current of the filter bank and capacitor bank to realize the control and protection of the filter bank and capacitor bank. The circuit-breaker is equipped with ABB HMB-8.12 compact spring hydraulic operating mechanism for division, closing and automatic reclosing. Each column has an independent hydraulic system, which can be operated in separate phases to realize single-phase automatic reclosing. Through the electrical linkage can also be three-phase linkage operation to achieve three-phase automatic reclosing.


Main Features:


  • Double column four fracture form, interrupter chamber fracture parallel capacitor and closing resistor, Cut back on oil.

  • The mechanical reliability of the product is good, to ensure the mechanical life of 10,000 times.

  • The circuit breaker structure is compact, the arc extinguishing chamber is small, the contact movement speed is high, the performance is stable and reliable, the service life is long, the comprehensive technical and economic indicators are high.

Technical parameter:


1719906238272.png

What kind of situation is the SF6 circuit breaker used?

Temperature Control:

  • Control the temperature of the installation environment to avoid adverse effects on the breaker's performance due to excessively high or low temperatures.

  • Avoid installing the breaker in locations exposed to direct sunlight or experiencing extreme temperature fluctuations.

Moisture Prevention Measures:

  • Implement moisture prevention measures to prevent water from entering the interior of the breaker, which can affect insulation performance and the normal operation of mechanical components.

  • Regularly inspect and clean the area around the equipment to remove dust and contaminants, preventing them from affecting the device's performance.


Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!