• 40.5kV wind power special load switch
40.5kV wind power special load switch
$2165.00
Model
NFZ77-40.5D
Basic info
Brand Wone
Model NO. NFZ77-40.5D wind power special load switch
Rated voltage 40.5kV
Rated normal current 1250A
Rated frequency 50(Hz)
shut-off current 50kA
Series NFZ77
Product Detail

Description:

It is mainly composed of a frame, an isolation switch (the current limiting fuse of the combined electrical appliance is installed on the isolation switch), a vacuum interrupter, a grounding switch, a spring operating mechanism, etc.It is suitable for three-phase AC 35kV, 50Hz power system, or used with complete sets of power distribution equipment, ring network switchgear, combined substation, etc.

Industry applications:

It is widely used in wind power generation, urban grid construction and renovation projects, industrial and mining enterprises, high-rise buildings and public facilities, etc., and can be used for power distribution, control and protection of ring network power supply units or terminal equipment.

Features:

  • State-of-the-art vacuum interrupter.

  • Compact structure and small size. 

  • Long electrical life and frequent operation.

  • Strong closing and breaking ability, safe and reliable.

  • Easy to operate and maintain.

  • Flexible spring-actuated mechanism

  • It uses an electric motor (with manual) spring energy storage.

  • It has the ability of remote control.

  • There are two methods: electromagnet electric synthesis and interpretation.

  • It can be equipped with over-current protection function.

  • Powerful all-in-one features

  • It integrates circuit breaker, disconnector and grounding switch.

  • Visible isolation fractures and grounding knives with closing capability.

  • Reliable mis-proof mechanical interlocks.

  • The ability to interrupt the rated current (NFZR77-40.5D/T63-31.5 interruptable short-circuit current) and prevent the equipment from running out of phase.

Technical parameters:

image.png

image.png

Product show:

image.png


Product show:

20140829094947.jpg


Why choose us:

  • We have a professional service team

  • We have good after-sales

  • We can guarantee the quality of our products

What is a wind load switch?

A wind power load switch is a specialized switching device used in wind power generation systems. It is primarily used to control and protect the connection lines between wind turbines and the power grid. The switch can connect and disconnect a certain load current under normal conditions and can promptly cut off the circuit when faults such as overloads or short circuits occur, thereby protecting the wind power generation equipment and the power grid.

Operating Principle:

When the wind turbine is generating electricity normally and supplying power to the grid, the wind power load switch is in the closed position, allowing current to flow through the contact system between the generator and the grid. When maintenance or inspection of the wind turbine is required, or when a fault occurs in the grid (such as an overload or short circuit), the operating mechanism drives the contacts apart. At this point, the arc extinguishing system activates, quickly quenching the arc generated by the separation of the contacts, thus interrupting the circuit and providing protection for the electrical system. Once the fault is resolved, the wind power load switch can be reclosed to re-establish the connection between the wind turbine and the grid.



Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!