• 550kV HV SF6 Circuit Breaker
550kV HV SF6 Circuit Breaker
discuss personally
Model
LW55B-550/4000-63
Basic info
Brand Wone
Model NO. 550kV SF6 Circuit Breaker
Rated voltage 550kV
Rated normal current 6300A
Series LW55B
Product Detail

Description:

LW55B-550/Y4000-50 tank type SF6 circuit breaker is the 3-phase AC transmission equipment.Used in the power system of 550KV, can be realized the controlling, measurement and protection. It is composed of circuit breaker, current transformer and bushings for the wire’s incoming and outgoing. Circuit breaker is a single fracture design, equipped with the first domestic integrated block, high-power hydraulic operating mechanism, all of the hydraulic pipes built-in, no leakage.

This is a product based on new technology research and development, and its performance is at the leading level in the world.


Main Features:


  • Circuit breaker arcing chamber is a single fracture design, simple and reasonable structure, high technical content.

  • Strong breaking capacity, long contact electrical life(rated short circuit breaking up to 20 times), long service period.

  • As for the rectifier circuit breaker, except for the bushing unit is packaged independently, arcing unit, hydraulic operating mechanism, current transformer and other components are packaged as a whole unit, without on-site docking and adjustment, easy installation.

  • Circuit breaker unit is installed on site without opening the chamber, which can be filled the SF6 gas directly, to avoid the intrusion of dust and foreign bodies

  • There are almost no external pipe for this new type of hydraulic operating mechanism, the possibility of oil leakage is reduced.

  • When operating the oil pressure, hydraulic operating mechanism is controlled by the pressure switch automatically, can be maintained constantly the rated oil pressure without being affected by ambient temperature, at the same time, the relief valve in the mechanism can be exempted from the risk of overpressure.

  • After the loss of pressure, hydraulic operating mechanism has the function of not slowing points when the pressure is reconstructed.

  • The closing resistance of the product can be installed or removed according to the user’s requirements.

Technical Parameters:

1720766371937.png

What are the requirements for monitoring the gas decomposition products of the SF6 tank circuit breaker?


During the normal operation and interruption processes of a circuit breaker, SF₆ gas can decompose, producing various decomposition products such as SF₄, S₂F₂, SOF₂, HF, and SO₂. These decomposition products are often corrosive, toxic, or irritating, and therefore require monitoring.If the concentration of these decomposition products exceeds certain limits, it may indicate abnormal discharges or other faults within the arc quenching chamber. Timely maintenance and handling are necessary to prevent further damage to the equipment and to safeguard personnel health.


Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!