• 576KWh Outdoor portable power station
  • 576KWh Outdoor portable power station
  • 576KWh Outdoor portable power station
  • 576KWh Outdoor portable power station
  • 576KWh Outdoor portable power station
576KWh Outdoor portable power station
$8400.00
Model
OP-5000-4800
OP-3200-2560
OP-3000-2880
OP-2000-1843
OP-1500-1536
OP-1200-1008
OP-600-576
Basic info
Brand Wone
Model NO. Outdoor portable power station
Rated Output Rating 5kW
Energy storage capacity 4.8kWh
Series Portable power station
Product Detail

Peculiarity

  • Light weight, high capacity, stable power.

  • Rich interface, compatible with USB-A,USB-C,DC interface, cigarette lighter and other mainstream DC interface, and can provide 20~100W stable output.

  • Complete protection functions, high safety performance.

  • Support battery pack voltage and capacity customization to meet different use environments.

  • Mature technology, long cycle life.

  • Modular design, high power density, easy maintenance

Technical parameter

image.png

image.png

image.png

NOTE:

Optional AC socket

CZ.png

Optional AC socket output standard

220V 50HZ    /      230V 50HZ   /      230V 60HZ/

110V 60HZ   /      110V50HZ

The output electric energy standard is applicable to most countries or regions such as Chinese mainland, Hong Kong, Macao, North Korea,Japan,Australia, South Asia, the Middle East, Europe, Africa, South America, etc., and customers in non-above regions can customize according to the customer's local electric energy standard.

How does a portable power station work?

Overview of working principle.
The main working principle of a portable power station is to store electrical energy through energy storage units (such as battery packs) and convert the stored electrical energy into alternating current (AC) when needed for use by various electrical appliances. The specific working process is as follows:

  • Energy storage:Portable power stations store electrical energy through battery packs. These battery packs usually use lithium-ion battery technology because they have high energy density and a long service life.

  • Energy management:The battery management system (BMS) monitors the state of the battery, including parameters such as voltage, current, and temperature, and optimizes the battery's charging and discharging process through algorithms to ensure the safe and efficient operation of the battery.The energy management system (EMS) is responsible for the operation strategy of the entire system, including when to charge, when to discharge, and how to optimize energy distribution.

  • Energy conversion:The inverter converts the direct current (DC) in the battery pack into alternating current (AC) for use by household appliances, electronic devices, etc.The inverter is also responsible for ensuring the quality of the output electrical energy, such as voltage stability and accurate frequency.

  • Energy release:When electricity is needed, the stored direct current is converted into alternating current through the inverter and output to terminal devices for use through sockets or other interfaces.


Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!