• 6kV 10kV High-voltage starting reactor with F Insulation Class
6kV 10kV High-voltage starting reactor with F Insulation Class
discuss personally
Model
QKSG-520/6
QKSG-460/6
QKSG-410/6
Basic info
Brand POWERTECH
Model NO. High-voltage starting reactor
Starting current 127A
Starting capacity 460KVar
Series QKSG
Product Detail

Description:

When the AC asynchronous motor is started at the rated voltage, the initial starting current is very large, often exceeding many times of the rated current (generally 5~7 times). In order to reduce the starting current and not affect the power grid, the AC asynchronous motor is usually started by reducing the voltage, and the commonly used step-down method is to use a reactor or autotransformer, and the starting process of the AC motor is very short (generally a few seconds to two minutes), and the reactor or autotransformer used for step-down start-up is cut off after starting.

Feature:

  • The core is made of silicon steel sheet, the core column is divided into uniform small sections through multiple air gaps, the air gap is isolated by epoxy plates, and high-temperature binders are used to ensure that the air gap does not change under the long-term operation of the reactor.

  • The end face of the iron core is made of silicon steel sheet end glue, so that the silicon steel sheet is firmly combined, which greatly reduces the noise during operation and has good corrosion resistance.

  • The coil wrapping structure, the main insulation of the coil is impregnated with glass fiber epoxy resin, and the coil is impregnated with high-temperature insulating paint under vacuum after hot baking and curing, the coil not only has good insulation performance, but also has high mechanical strength, and can withstand the large current impact and cold and hot shock when the motor is started without cracking.

Parameters:

Rated voltage: 6kV, 10kV

Rated frequency: 50Hz, 60Hz

Insulation grade: F

class Starting time: 120S, after 120S, it should be cooled for 6 hours before starting again

企业微信截图_1733189802375.png

企业微信截图_17331897371535.png

Standard:

image.png

Conditions for the use:

  • The altitude does not exceed 2000m.

  • Ambient temperature -25~+45°C, relative humidity ≤90%.

  •  There are no harmful gases around, no flammable and explosive materials.

  •  The waveform of the supply voltage is similar to that of a sine wave.

  • The surrounding environment should be well ventilated, if installed in the cabinet, ventilation equipment should be installed.

  •  Indoors.


What are the differences in the working methods of different types of reactors?

Shunt Reactors:

  • Shunt reactors are primarily used to compensate for capacitive currents, improve power factor, and stabilize grid voltage. They are connected in parallel with the grid and absorb reactive power to regulate the reactive power balance in the grid.

Series Reactors:

  • Series reactors are connected in series within the circuit and are used to limit short-circuit currents, improve the transient stability of the power system, and other purposes. For example, in high-voltage transmission systems, series reactors can limit the short-circuit current during faults, protecting electrical equipment. In power electronic circuits, series reactors can smooth the input current and reduce harmonic distortion.

 

Know your supplier
POWERTECH
We are an electrical company that manufactures and sells high and low voltage electrical products.
Main Categories
High Voltage Electrical Apparatus
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$120000000
Professional Experience
7 years
Workplace
580000m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!