• LVQB SF6 gas insulated current transformer
  • LVQB SF6 gas insulated current transformer
LVQB SF6 gas insulated current transformer
discuss personally
Model
LVQB-40.5
Basic info
Brand Wone
Model NO. LVQB SF6 gas insulated current transformer
Rated voltage 40.5kV
Series LVQB
Product Detail

Product introduction:
    LVQB series current transformers are SF6 gas insulated, inverted structure to meet the IEC/IEEE standard.The series connected transformer in the line has the functions of electricenergy measurement, metering, relay protec tion and transient protection.
Product features:
●The primary winding is of through type conductive rod structure with good dynamic and thermal stability.
●The maximum thermal stability current is 63kA/3s (when the primary winding is in series). 
●The primary winding passes through the center of the secondary winding without the influence of magnetic flux leakage, and the measurement accuracy reaches 0.1 and 0.2s
●The upper shell is of aluminum alloy welding structure, and the top is equipped with a metal explosion-proof disc. If the internal high-energy discharge occurs, when the gas pressure exceeds 1.0MP a, the explosion-proof disc will break, so as to achieve the purpose of pressure release, improve product safety, and there is no danger of explosion.
●The secondary winding is poured into the aluminum shield housing with organic materials, and the measuring and protection lines at the secondary side will not be subject to electrical attack due to insulation breakdown.
●The optimized electrode shielding structure improves the internal and external electric field distribution of the product, and the insulation performance is excellent. The local discharge test is conducted under the power frequency test voltage.
●The cast aluminum footing is directly cast on the external insulating bushing, and the bottom plate bolt is fixed with the footing from the bottom up to avoid water ingress and ponding from the base fastener. The secondary outlet box is cast with stainless steel or aluminum alloy. The dust-proof, waterproof and breathable sealing structure meets the requirements of IP55. 
●The secondary terminals for users to connect are Phoenix special terminal blocks, which are more convenient and fast to plug, pull and connect.
●The sealing ring is made of ethylene propylene diene monomer (EPDM) and imported fluor silicone rubber. It is suitable for areas with high and low temperature changes and harsh ambient temperatures. The annual air leak age rate is less than 0.5%.
●The product performance remains unchanged after rigorous transportation vibration test.
●The shell, base and junction box are all made of aluminum alloy. The nameplate is made of stainless steel. All exposed parts will never rust. The base is equipped with a density meter, which can display the gas pressure inside the transformer (the displayed value is automatically converted to the internal gas pressure at 20 ℃) and density. When the internal pressure of the transformer drops to the alarm pressure, it will provide a signal and require gas supplement.

LVQB SF6 gas insulated current transformer-2.png

LVQB SF6 gas insulated current transformer-3.png

Remark: Approximate dimensions and weights for special requirements, please consult us.

Know your supplier
Wone
Main Categories
High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Wire cable/Instrument meters/New energy/Tester/Production equipment/Generator/Electrical fittings/Integrated Electrical Equipment
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$50,000,000
Professional Experience
1 years
Workplace
65666m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!