Parallel Operation of the Alternators

Edwiin
05/26/2025

Interconnection of Electric Power Systems
The interconnection of electric power systems is critical for economic efficiency, reliability, and parallel operation. Interconnecting AC power systems requires synchronous generators to operate in parallel, a practice commonly employed in generating stations where two or more generators are connected via transformers and transmission lines, forming a grid-connected network. Under normal operation, all generators and synchronous motors in an interconnected system maintain synchronism, enabling optimized operating efficiency and enhanced reliability through parallel configuration.
When load demand exceeds the capacity of connected units, additional generators are paralleled to carry the load; conversely, during low-demand periods, non-essential units are disconnected to maintain high-efficiency operation.
Reasons for Parallel Operation of Alternators
Alternators are operated in parallel for the following key advantages:
  • Higher Load Capacity: Multiple alternators can supply larger loads than a single unit.
  • Efficiency Optimization: During light loads, some alternators can be shut down, allowing remaining units to operate near full load for higher efficiency.
  • Maintenance Flexibility: Scheduled maintenance or inspection of one machine does not disrupt supply, as other units maintain continuity.
  • Reliability Assurance: Generator breakdowns do not cause power outages, as parallel units compensate.
  • Scalability: Additional machines can be added without modifying the initial installation to meet growing load demands.
  • Cost Reduction: Parallel operation lowers both operating costs and energy generation expenses.
  • Supply Security: Ensures more reliable power supply and enables economical generation across the system.
Necessary Conditions for Parallel Operation of Alternators
Synchronous machines operate in parallel through a process called synchronizing, where a new unit (incoming machine) is connected to an existing system (running machines or infinite busbar). To ensure safe parallel operation, the following conditions must be met:
  • Phase Sequence Matching: The phase sequence of the busbar voltages must align with that of the incoming machine.
  • Phase Synchronization: The busbar voltages and the incoming machine’s terminal voltage must be in phase.
  • Voltage Equality: The terminal voltage of the incoming machine must match the busbar voltage.
  • Frequency Matching: The frequency of the incoming machine’s generated voltage must equal the busbar voltage frequency.
Edwiin

Hello,I'm Wdwiin. A decade of hands-on experience in electrical engineering, specializing in high-voltage systems, smart grids, and renewable energy technologies. Passionate about technical exchange and knowledge sharing, committed to interpreting industry trends with professional insights to empower peers. Connection creates value—let’s explore the boundless possibilities of the electrical world together!

Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
Inquiry
Download