• 35kV Class oil-immersed transformer
  • 35kV Class oil-immersed transformer
  • 35kV Class oil-immersed transformer
35kV Class oil-immersed transformer
discuss personally
Model
SBH15M-2500/20
SBH15M-2000/20
SBH15M-1600/20
SBH15M-1250/20
SBH15M-1000/20
SBH15M-800/20
SBH15M-630/20
SBH15M-500/20
SBH15M-400/20
SBH15M-315/20
SBH15M-250/20
SBH15M-200/20
SBH15M-160/20
SBH15M-125/20
SBH15M-100/20
SBH15M-80/20
SBH15M-63/20
SBH15M-50/20
SBH15M-30/20
S9(M)-3150/10.5
S9(M)-2500/10.5
S9(M)-2000/10.5
S9(M)-1600/10.5
S9(M)-1250/10.5
S9(M)-1000/10.5
S9(M)-800/10.5
S9(M)-630/10.5
S9(M)-500/10.5
S9(M)-400/10.5
S9(M)-315/10.5
S9(M)-250/10.5
S9(M)-200/10.5
S9(M)-160/10.5
S9(M)-125/10.5
S9(M)-100/10.5
S9(M)-80/10.5
S9(M)-63/10.5
S9(M)-50/10.5
S9(M)-30/10.5
S9(M)-3150/35
S9(M)-2500/35
S9(M)-2000/35
S9(M)-1600/35
S9(M)-1250/35
S9(M)-1000/35
S9(M)-800/35
S9(M)-630/35
S9(M)-500/35
S9(M)-400/35
S9(M)-315/35
S9(M)-250/35
S9(M)-200/35
S9(M)-160/35
S9(M)-125/35
S9(M)-100/35
S9(M)-50/35
S9(M)-5000/35
S9(M)-4000/35
S9(M)-3150/35
S9(M)-2500/35
S9(M)-2000/35
S9(M)-1600/35
S9(M)-1250/35
S9(M)-1000/35
Basic info
Brand ROCKWILL
Model NO. 35kV Class oil-immersed transformer
Rated capacity 1000kVA
Primary voltage 20kV
Secondary voltage 0.4kV
Methods of regulation On Load Voltage Regulating
Winding type Double Winding
Series S/SBH Series
Product Detail

Overview

1.Iron Core

The iron core is made of cold rolled, granular-oriented, low-loss and high magnetic conductive silicon steel, which is of multi-step completely tilted structure to reduce the loss and noise. 

Iron core with fixed clamps optimizes the design so as to ensure mechanical strength and to reduce leakage losses.

Adoption of PET banding structure ensures the clamp force of core column and lowers the noise.

2.Winding

Using cylinder type, foil type, screw type, continuous type and interleaved type to ensure uniform voltage distribution.

Adopting oil-oriented architecture in the winding to reduce temperature rise. To set up separate tap winding in large capacity transformers to eliminate damage when short circuit occurs.

3. Active-parts

Cold pressing ensures cleanness of the body active parts and the reliability of leads. Adoption of whole assembled phase insulation so as to reduce the assembly and effective guarantee the dimension and shape of the insulation structure.

4.Oil Tank 

The oil tank of 35kV transformer adopts barrel type or bell type structure and use finned radiator. It usually don't have trolley while allocating standard base for installation. To kink the tank wall as one-stop forming to avoid weld seam.

The oil tank of 10kV transformer adopts L-bar type and use corrugated radiator. It use water proof test, air leakage test and oil leakage test to guarantee leakage free. The surface coating is strictly controlled.


Operating condition

1.working temperature:-25℃~40℃

2.Relative humidity: <90% (25℃) 

3.No corrosive gas, no obvious dirt, etc.

4.Altitude: <1000m

5.Installation place: Without corrosive gas, dirt and so on

6.Special conditions: customized products are available

 

If you need to know about more parameters , Please check the model selection manual.

Know your supplier
ROCKWILL
Rockwill Electric Group Global Manufacturer of High voltage and medium-voltage power equipment and smart grid solutions. Headquartered in Wenzhou, China. Serving 100+ countries with quality, innovation, and trust. What We Offer: • HV-MV switchgear (VCB, SF₆ circuit breakers, RMU, GIS) • Distribution transformers and substations • Smart grid and monitoring systems • Solar, wind, EV charging, and energy storage solutions • EPC turnkey power projects Certified: ISO 9001 / ISO 14001 / ISO 45001
Main Categories
High Voltage Electrical Apparatus
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150,000,000
Professional Experience
16 years
Workplace
108000m²m²
占位
占位
Related Products
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!