• 40.5kV 72.5kV 126kV 252kV 363kV 500kV 800kV HV Grounding Switch
  • 40.5kV 72.5kV 126kV 252kV 363kV 500kV 800kV HV Grounding Switch
40.5kV 72.5kV 126kV 252kV 363kV 500kV 800kV HV Grounding Switch
discuss personally
Model
JW8-800-63
JW8-550-63
JW8-363-63
JW6-252-50
JW6-126-40
JW6-72.5-40
JW6-40.5-40
Basic info
Brand ROCKWILL
Model NO. 40.5KV 72.5KV 126KV 252KVseries high voltage earthing switch
Rated voltage 72.5kV
Series JW6(8) Series
Product Detail

Description

The JW6/8 series high-voltage grounding switches feature a three-single-pole configuration integrated with an operating mechanism. Each single pole comprises a base, a pillar insulator, and a conductive rod: the rod is mounted on the base, while the static contact is positioned at the top of the insulator.

Driven by the operating mechanism, the conductive rod rotates upward from the horizontal position via transmission components, latching or inserting into the static contact to achieve switch closure; the opening process reverses this motion.

Main Features:


  • Streamlined Design & Versatility:The product’s simple, rational structure enables effortless assembly, transportation, installation, and debugging, adapting to diverse field requirements.

  • High-Performance Conductive Components:Constructed from high-strength alloy profiles, the conductive rods offer excellent electrical conductivity, robust mechanical strength, and lightweight design. Their superior anti-corrosion properties ensure prolonged service life in harsh environments.

Technical parameter:

1732242955389.png

How is the indoor high-voltage AC grounding switch electrically tested?

  • Insulation Resistance Test: Use an insulation resistance tester to measure the insulation resistance of the grounding switch. The insulation resistance value should meet the product standards and relevant electrical codes. Generally, for indoor high-voltage AC grounding switches, the insulation resistance should be in the range of several gigohms or more to ensure good insulation performance during operation and prevent leakage accidents.

  • Loop Resistance Test: Measure the loop resistance of the grounding switch using a dedicated loop resistance tester to check if the contact points are in good condition. The loop resistance value should fall within the specified range. If the loop resistance is too high, it may cause significant heating when current flows through the grounding switch, affecting its normal operation.

  • Grounding Performance Check: Ensure that the grounding connection is reliable and that the grounding resistance meets the requirements. If the grounding resistance is too high, it may prevent the current from being effectively discharged to the ground during a fault, thus failing to provide adequate protection for maintenance personnel and equipment.

Know your supplier
ROCKWILL
Rockwill Electric Group Global Manufacturer of High voltage and medium-voltage power equipment and smart grid solutions. Headquartered in Wenzhou, China. Serving 100+ countries with quality, innovation, and trust. What We Offer: • HV-MV switchgear (VCB, SF₆ circuit breakers, RMU, GIS) • Distribution transformers and substations • Smart grid and monitoring systems • Solar, wind, EV charging, and energy storage solutions • EPC turnkey power projects Certified: ISO 9001 / ISO 14001 / ISO 45001
Main Categories
High Voltage Electrical Apparatus
Business Type
Design/Manufacture/Sales
Highest Annual Export (USD)
$150,000,000
Professional Experience
16 years
Workplace
108000m²m²
占位
占位
Related Knowledges
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
Cost Differences and Performance Comparison of 35kV New Energy Transformers Based on Dry-Type, Mineral Oil, and Vegetable Oil
For users, when purchasing a 35kV new energy transformer, choosing between dry-type, mineral oil-filled, or vegetable oil-filled types involves multiple considerations. These include user habits, maintenance-free performance, safety and fire resistance, volume and weight, among others. However, cost differences are undoubtedly one of the most crucial factors.To illustrate the issue intuitively, this paper selects a three-level energy efficiency dual-winding new energy transformer with a rated ca
Ron
07/26/2025
What is the connection group of a transformer?
What is the connection group of a transformer?
Transformer Connection GroupThe connection group of a transformer refers to the phase difference between the primary and secondary voltages or currents. It is determined by the winding directions of the primary and secondary coils, the labeling of their start and end terminals, and the connection mode. Expressed in a clock-like format, there are 12 groups in total, numbered from 0 to 11.The DC method is commonly used to measure the transformer's connection group, mainly to verify whether the con
Vziman
07/26/2025
Working Voltage in Power System
Working Voltage in Power System
Working VoltageThe term "working voltage" refers to the maximum voltage that a device can withstand without sustaining damage or burning out, while ensuring the reliability, safety, and proper operation of both the device and associated circuits.For long-distance power transmission, the use of high voltage is advantageous. In AC systems, maintaining a load power factor as close to unity as possible is also economically necessary. Practically, heavy currents are more challenging to handle than hi
Encyclopedia
07/26/2025
What is Steady State Stability in Power System?
What is Steady State Stability in Power System?
Definition of Steady State StabilitySteady state stability is defined as the capability of an electric power system to sustain its initial operating condition following a small disturbance, or to converge to a state closely approximating the initial condition when the disturbance persists. This concept holds critical significance in power system planning and design, the development of specialized automatic control devices, the commissioning of new system components, and the adjustment of operati
Edwiin
07/26/2025
What is the sequence for powering down the transformer?
What is the sequence for powering down the transformer?
The sequence for shutting down a main transformer is as follows: when de-energizing, the load side should be shut down first, followed by the power supply side. For energizing operations, the reverse order applies: the power supply side is energized first, then the load side. This is because: Energizing from the power supply side to the load side makes it easier to identify the fault range and take prompt judgment and handling measures in case of a fault, preventing the fault from spreading or e
Rockwell
07/26/2025
What are the methods for switching operations of station transformers?
What are the methods for switching operations of station transformers?
Let's take an auxiliary power system with two station transformers as an example. When one station transformer needs to be out of service, there are two operation methods: non-interruptive power supply and instantaneous power interruption. Generally, the method of instantaneous power interruption on the low-voltage side is preferred.The operation method for instantaneous power interruption on the low-voltage side is as follows:Open the 380V power incoming circuit breaker of the corresponding sec
Vziman
07/26/2025
×
Inquiry
Download
IEE-Business is dedicated to serving the personnel in the global power industry.
Join IEE-Business, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!