• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


660V mine special frequency converter

  • 660V mine special frequency converter

Key attributes

Brand Rw Energy
Model NO. 660V mine special frequency converter
Rated frequency 50/60Hz
Series GD2000

Product descriptions from the supplier

Description

Overview

GD2000 series frequency converter is a high-performance vector frequency conversion movement product, which can be used to control asynchronous AC induction motors and permanent magnet synchronous motors to meet the working modes of different motors. The product adopts a high-performance DSP control system, and strengthens the reliability and adaptability of the product to the environment, as well as customized and industrial design, with more optimized functions, more flexible applications, and more stable performance.

Product features

  • Compatible with the control of synchronous motor and asynchronous motor.

  • Support master-slave synchronous control of multi-point motor drive.

  •  Provide special input and output filters for frequency converters. Meet the special EMC requirements of the industry.

  • Support Modbus, Profibus-DP, Ethernet, CAN communication and other communication methods.

Specifications

Product Type:

GD2000-01 series

GD2000-11 series

Function description

Specifications

input

Rated Input Voltage (V)

AC 3PH 660V(-15%~+15%) 

Rated input frequency

50Hz/60Hz, allowable range 47~63Hz

Rated Input Efficiency (%)

More than 98%

Rated input power factor (%)

0.85 or higher

0.99 or higher

output

Rated Output Voltage (V)

0~input voltage

Output frequency

0~400Hz 

Operational control characteristics

Control mode

V/F (with V/F separation), open-loop vector

Speed ratio

Synchronous machine: 1:200 (open-loop vector); Asynchronous: 1:20 (open-loop vector)

Speed control accuracy

Closed-loop vector: ±0.1% maximum velocity; Open-loop vector: ±0.5% maximum speed

Speed fluctuations

±0.3% (open-loop vector control)

Torque control accuracy

10% (open-loop vector control)

Starting torque

0.5Hz 150% (open-loop vector control)

Overload capacity

150% rated current 60s, 180% rated current 10s, 200% rated current 1s

Important features:

Master-slave control, multi-speed operation, simple PLC, multiple acceleration and deceleration time switching, S-curve acceleration and deceleration, fan operation control, energy-saving operation, PID adjustment, MODBUS communication, sag control, torque control, torque and speed control mode switching, etc

Protection function

Motor overheat protection, overload protection, overvoltage protection, undervoltage protection, input phase loss protection, output phase loss protection, overcurrent protection, overheat protection, overvoltage stall protection, overcurrent stall protection, short circuit protection and other protection functions

Peripheral interface

Analog input

1 channel (AI1, AI2) 0~10V/0~20mA

Analog output

1 channel (AO1, AO2)-10~10V/-20~20mA

Digital input

It comes standard with 6 digital inputs

 

Standard 3 relay outputs, electric shock capacity: 3A/AC250V, 1A/DC30V

Communication mode

485 communication (MODBUS protocol) is standard, and CAN, fiber, and Profibus-DP are optional

other

keyboard

LCD display as standard, compatible with LED keyboards

Operating ambient temperature

-10°C~+40°C, and above 40°C need to be downgraded

relative humidity

5%~95% 

Storage temperature

-40℃~+70℃ 

altitude

Below 1000 meters, more than 1000 meters will be degraded by 1% for every 100 meters

Protection level

IP00 

FAQ for
Q: Can it be integrated with the existing PLC system?
A:

Supports protocols such as Modbus and Profibus DP, and can be directly connected to old systems without major modifications. Plug it in and use it, debug quickly, maintain easily, upgrade mining equipment easily, save money and worry.

Q: Do you need anti sway function to enhance the device?
A:

It must be! Specially designed for mine lifting, automatically suppressing cargo shaking. Real time speed adjustment during lifting, without shaking or shaking, to avoid damage to goods or injury to personnel, safe and efficient, and more reassuring for mining operations.

Q: Can the mining environment withstand it?
A:

IP00 design but with dust and corrosion prevention treatment, 3M5 seismic standard can withstand mine vibrations. Equipped with a built-in C3 filter, it suppresses harmonic interference and is not afraid of heavy dust. The equipment runs stably, making it more reassuring for miners to use.

Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 30000m² Total staff: Highest Annual Export(usD): 100000000
Workplace: 30000m²
Total staff:
Highest Annual Export(usD): 100000000
Services
Business Type: Design/Manufacture/Sales
Main Categories: High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Instrument meters/New energy/Tester/Robot
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
    Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
    01/30/2026
  • Distribution Equipment Transformer Testing, Inspection, and Maintenance
    1.Transformer Maintenance and Inspection Open the low-voltage (LV) circuit breaker of the transformer under maintenance, remove the control power fuse, and hang a “Do Not Close” warning sign on the switch handle. Open the high-voltage (HV) circuit breaker of the transformer under maintenance, close the grounding switch, fully discharge the transformer, lock the HV switchgear, and hang a “Do Not Close” warning sign on the switch handle. For dry-type transformer maintenance: first clean the porcel
    12/25/2025
  • How to Test Insulation Resistance of Distribution Transformers
    In practical work, insulation resistance of distribution transformers is generally measured twice: the insulation resistance between thehigh-voltage (HV) windingand thelow-voltage (LV) winding plus the transformer tank, and the insulation resistance between theLV windingand theHV winding plus the transformer tank.If both measurements yield acceptable values, it indicates that the insulation among the HV winding, LV winding, and transformer tank is qualified. If either measurement fails, pairwise
    12/25/2025
  • Design Principles for Pole-Mounted Distribution Transformers
    Design Principles for Pole-Mounted Distribution Transformers(1) Location and Layout PrinciplesPole-mounted transformer platforms should be located near the load center or close to critical loads, following the principle of “small capacity, multiple locations” to facilitate equipment replacement and maintenance. For residential power supply, three-phase transformers may be installed nearby based on current demand and future growth projections.(2) Capacity Selection for Three-Phase Pole-Mounted Tr
    12/25/2025
  • Risk Identification and Control Measures for Distribution Transformer Replacement Work
    1.Electric Shock Risk Prevention and ControlAccording to typical design standards for distribution network upgrades, the distance between the transformer’s drop-out fuse and the high-voltage terminal is 1.5 meters. If a crane is used for replacement, it is often impossible to maintain the required minimum safety clearance of 2 meters between the crane boom, lifting gear, slings, wire ropes, and the 10 kV live parts, posing a severe risk of electric shock.Control Measures:Measure 1:De-energize th
    12/25/2025
  • Analysis of Common Faults and Causes in Routine Inspection of Distribution Transformers
    Common Faults and Causes in Routine Inspection of Distribution TransformersAs the terminal component of power transmission and distribution systems, distribution transformers play a critical role in supplying reliable electricity to end users. However, many users have limited knowledge of power equipment, and routine maintenance is often carried out without professional support. If any of the following conditions are observed during transformer operation, immediate action should be taken: Excess
    12/24/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.