• Product
  • Suppliers
  • Manufacturers
  • Solutions
  • Free tools
  • Knowledges
  • Experts
  • Communities
Search


Hanging gun type DC Fast EV Charger

  • Hanging gun type DC Fast EV Charger

Key attributes

Brand RW Energy
Model NO. Hanging gun type DC Fast EV Charger
Rated voltage 3*230(400)V
Rated normal current 250A
Rated Output Rating 120kW
Connector Options CHAdeMO
Cable Length 5m
Series WZ07

Product descriptions from the supplier

Description

Product Overview

120-240kW DC Fast EV Charger: Multi-standard, high-efficiency charging with smart OCPP connectivity.Our 120kW-240kW DC fast charging station delivers high-performance charging for global markets, supporting multiple international standards and smart connectivity.

Key Features

  • Ultra-fast charging: Reaches 80% charge in just 30 minutes

  • Multi-standard compatibility: Supports CHAdeMO, GB/T 20234.1/3, CCS1, and CCS2

  • High efficiency: >95% efficiency with PF>0.99 (APFC)

  • Smart connectivity: OCPP 1.6J (JSON), RFID (ISO14443A), 7" touchscreen HMI

  • Multi-language support: English, French, Spanish, Russian

  • Network options: Ethernet/4G/3G connectivity

  • Robust design: IK10 impact resistance & IP54 protection

  • Easy installation and maintenance

  • Hanging gun design: Mobile charging gun saves more effort

Product Advantages

  • Global market adaptability with major EV standards support

  • Energy-efficient operation with active power factor correction

  • Future-ready smart charging with OCPP 1.6 compliance

  • User-friendly interface with touchscreen and RFID authentication

  • Reliable performance in harsh conditions

Technical data

Category

specifications

Data parameters

Product Model

WZ07-120kW

WZ07-160kW

WZ07-180kW

WZ07-240kW

Appearance structure

Dimensions (L x D x H)

750mm x 600mm x 1900mm

Weight

336kg

Length of charging cable

5m

Connectors

GBT,CCS2,CCS1,CHAdeMO,NACS

Electrical indicators

Input Voltage

400VAC / 480VAC (3P+N+PE)

Input frequency

50/60Hz

Output Voltage

200 - 1000VDC

Output current

1-250A

rated power

120kW

160kW

180kW

240kW

Efficiency

Peak Power ≥96%

Power factor

>0.98

Communication protocol

OCPP 1.6J (State Grid Corporation of China,YKC, Xiao ju and other operating platforms.)

functional design

Display

7inch LCD with touch screen

Number of guns

2

Access Control

RFID/ ISO/IEC 14443A/B / POS machine (Optional)

Communication

WIFI/Ethernet / 3G/4G Modem (Optional)

Power Electronics Cooling

Air Cooled

work environment

Operating temperature

-30°C to 75°C

Working/Storage Humidity

≤ 95% RH / ≤ 99% RH (Non-condensing)

Altitude

< 2000m

Ingress Protection

IP54 / IK10

safety design

Safety protection

Overvoltage protection, lightning protection, overcurrent protection, leakage protection, waterproof protection, etc

Emergency Stop

Emergency Stop Button Disables Output Power

Dimension

Hanging gun type DC Fast EV Charger Dimension

Application Scenarios

  • Public charging networks for highways and urban areas

  • Fleet and commercial vehicle charging solutions

  • Smart city infrastructure projects

  • Commercial property installations

  • Custom OEM solutions

Documentation Resource Library
Public.
High-performers fast charger selection catalog
Catalogue
English
FAQ
Q: Which device should I choose for commercial scenarios?
A:

1. Only as an additional service, not for profit purposes: For scenarios such as hotels/homestays, beauty salons, etc., it is recommended to use a light asset model and deploy a small amount of WZ15L, WZ15W, or WZ17W for charging settlement through local pricing models, in order to provide additional value-added services.
2. Scenarios for small commercial charging stations/shopping mall charging stations: Considering the load capacity of the station area, it is not possible to deploy too many charging positions. WZ05, WZ06, WZ07, WZ08, and other fast charging devices with one machine and two guns can be selected, which are the preferred choices for the renovation of old parking lots. They can be easily deployed and used. If you need a scenario with one machine and multiple positions, you can choose the WZ09 and WZ10 series.
3. Medium to large commercial charging station scenarios: Choose multiple integrated one machine dual gun high-power solutions, such as WZ06, WZ07, WZ08, WZ09, WZ10 series, or a set of WZ12 series, to meet the simultaneous charging of multiple vehicles.
4. Large and ultra large commercial charging scenarios: Choose the WZ12 series, equipped with a large number of fast charging terminals and a small number of liquid cooled charging terminals. Firstly, it can meet the ultra fast charging needs of some high-end car models, demonstrating operational strength and improving reputation. Secondly, it can meet the simultaneous charging needs of many vehicles through a large number of fast charging terminals.

Q: Which products support intelligent power regulation? What effects can be achieved?
A:

The entire system supports intelligent power regulation, which can dynamically allocate power based on grid load and battery status, avoiding grid overload and reducing operating costs.

Q: Does the product support OTA remote upgrade? What does the upgrade feature include?
A:

All WZ series products support OTA remote upgrades, which can be carried out through commercial backend pre updates to achieve protocol updates and vulnerability fixes without on-site operations, reducing maintenance costs for commercial operations.

Know your supplier
Online store
On-time delivery rate
Response time
100.0%
≤4h
Company overview
Workplace: 30000m² Total staff: Highest Annual Export(usD): 100000000
Workplace: 30000m²
Total staff:
Highest Annual Export(usD): 100000000
Services
Business Type: Design/Manufacture/Sales
Main Categories: High Voltage Electrical Apparatus/Low Voltage Electrical Apparatus/Instrument meters/New energy/Tester/Robot
Whole life care manager
Whole-life care management services for equipment procurement, use, maintenance, and after-sales, ensuring safe operation of electrical equipment, continuous control, and worry-free electricity consumption.
The equipment supplier has passed platform qualification certification and technical evaluation, ensuring compliance, professionalism, and reliability from the source.

Related Products

Related Knowledges

  • Faults and Handling of Single-phase Grounding in 10kV Distribution Lines
    Characteristics and Detection Devices for Single-Phase Ground Faults1. Characteristics of Single-Phase Ground FaultsCentral Alarm Signals:The warning bell rings, and the indicator lamp labeled “Ground Fault on [X] kV Bus Section [Y]” illuminates. In systems with a Petersen coil (arc suppression coil) grounding the neutral point, the “Petersen Coil Operated” indicator also lights up.Insulation Monitoring Voltmeter Indications:The voltage of the faulted phase decreases (in
    01/30/2026
  • Neutral point grounding operation mode for 110kV~220kV power grid transformers
    The arrangement of neutral point grounding operation modes for 110kV~220kV power grid transformers shall meet the insulation withstand requirements of transformer neutral points, and shall also strive to keep the zero-sequence impedance of substations basically unchanged, while ensuring that the zero-sequence comprehensive impedance at any short-circuit point in the system does not exceed three times the positive-sequence comprehensive impedance.For 220kV and 110kV transformers in new constructi
    01/29/2026
  • Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?
    Why Do Substations Use Stones, Gravel, Pebbles, and Crushed Rock?In substations, equipment such as power and distribution transformers, transmission lines, voltage transformers, current transformers, and disconnect switches all require grounding. Beyond grounding, we will now explore in depth why gravel and crushed stone are commonly used in substations. Though they appear ordinary, these stones play a critical safety and functional role.In substation grounding design—especially when multiple gr
    01/29/2026
  • Why Must a Transformer Core Be Grounded at Only One Point? Isn't Multi-Point Grounding More Reliable?
    Why Does the Transformer Core Need to Be Grounded?During operation, the transformer core, along with the metal structures, parts, and components that fix the core and windings, are all situated in a strong electric field. Under the influence of this electric field, they acquire a relatively high potential with respect to ground. If the core is not grounded, a potential difference will exist between the core and the grounded clamping structures and tank, which may lead to intermittent discharge.I
    01/29/2026
  • Understanding Transformer Neutral Grounding
    I. What is a Neutral Point?In transformers and generators, the neutral point is a specific point in the winding where the absolute voltage between this point and each external terminal is equal. In the diagram below, pointOrepresents the neutral point.II. Why Does the Neutral Point Need Grounding?The electrical connection method between the neutral point and earth in a three-phase AC power system is called theneutral grounding method. This grounding method directly affects:The safety, reliabilit
    01/29/2026
  • What’s the Difference Between Rectifier Transformers and Power Transformers?
    What is a Rectifier Transformer?"Power conversion" is a general term encompassing rectification, inversion, and frequency conversion, with rectification being the most widely used among them. Rectifier equipment converts input AC power into DC output through rectification and filtering. A rectifier transformer serves as the power supply transformer for such rectifier equipment. In industrial applications, most DC power supplies are obtained by combining a rectifier transformer with rectifier equ
    01/29/2026

Related Solutions

  • Distribution automation systems solutions
    What are the difficulties in overhead line operation and maintenance?Difficulty one:Overhead lines of distribution network have wide coverage,complicatedterrain,many radiation branches and distributed power supply,resultingin "many line faults and difficulty in fault troubleshooting".Difficulty Two:Manual troubleshooting is time-consuming and laborious.Meanwhile,therunning current,voltage and switching state of the line cannot be graspedin real time,because of the lack of intelligent technical m
    04/22/2025
  • RW8000 DMS Distribution Management System Solutions
    OverviewNowadays, the development trend of power grid is intellectualization. As an important part of power grid, the power distribution system is very close to the customers and it has to run properly. The distribution management system (DMS)played an important role in it.Introduction:RW8000 power distribution management system (DMS) is designed for the smart grids. It is based on real-time application, centered on distribution network operation and management, focusing on the business process
    09/07/2023
  • High-Precision Electrical Parameter Monitoring System Solution
    1.Introduction​With the increasingly stringent requirements for power supply quality in high-end facilities such as precision manufacturing, medical diagnosis, and data centers, traditional power monitoring systems, due to their low sampling accuracy and weak data analysis capabilities, can no longer meet the demand for deep insight and precise management of power quality. In response, we are introducing a new generation ​High-Precision Electrical Parameter Monitoring System. With ​millisecond-l
    09/28/2025
Haven't found the right supplier yet? Let matching verified suppliers find you. Get Quotation Now
Haven't found the right supplier yet? Let matching verified suppliers find you.
Get Quotation Now
Send inquiry
+86
Click to upload file
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.